PadelSpan
Padel Courts & Sports Equipment

Fixed Padel Court Canopy

Fixed padel court canopies for covered sports venues.

PadelSpan factory configuration overview · 1 November 2026. Product dimensions, component options and technical details for your padel court project.

Reference configuration

Arched split reference22 × 12 × 8.8 m overall (L × W × H)
Arched integrated reference20.6 × 10.6 × 8.8 m overall (L × W × H)
Split aluminium reference22 × 12 × 8.8 m overall (L × W × H)
Cover materialPVDF-coated membrane options
Clear playing heightDefined by the final coordinated drawing; not the overall roof height

Configuration options

Compare model-specific frame layouts and specifications. Our factory prepares the component schedule and drawings for your selected configuration.

Integrated Arch Padel Canopy

A compact one-piece arch canopy arrangement. Coordinate the roof supports and court interfaces with the site layout before defining foundations.

Overall dimensions L × W × H20.6 × 10.6 × 8.8 m
Column section100 × 100 × 3 mm
Column height6 m
Arch rise2.8 m
CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

Freestanding Arch Padel Canopy

A separate canopy structure around the court, with a wider footprint for coordinating circulation and functional areas.

Overall dimensions L × W × H22 × 12 × 8.8 m
Column section120 × 120 × 3 mm
Column height6 m
Arch rise2.8 m
CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

A-Frame Padel Canopy

A pitched canopy option for coordinating court coverage, perimeter supports and rainwater discharge. Review the roof envelope separately from the usable playing clearance.

Overall dimensions L × W × H22 × 12 × 8.8 m
Column section120 × 120 × 3 mm
Column height6 m
Roof rise reference2.8 m
CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

Aluminium Split Padel Court Canopy

A separate split aluminium roof configuration, illustrated by the A-frame visualization.

Overall reference L × W × H22 × 12 × 8.8 m
Structure referenceAluminium-alloy split roof configuration
MembraneConfirm the selected membrane specification
Frame sections and connectionsConfirm the model-specific aluminium schedule
Site interfaceIndependent foundation, drainage and load review

Padel court component options

Choose the materials, finishes and equipment for your padel court.

Roof coordination

Clear playing heightClear playing height coordinated below the lowest roof member, light or service
LED lighting8 × 200 W LED, 6500 K; 180–220 V / 50 Hz. Electrical selection adapted to the destination.
Lighting designLighting layout coordinated for playing visibility, uniformity and mounting height
Canopy membrane750 g/m² PVDF membrane option with supporting material reports
Water and site interfacesCoordinated gutters, downpipes, drainage, foundations and maintenance access

Equipment scope

Options to discuss

Site and installation interfaces

Provide the site layout and applicable structural design requirements. Coordinate supports and foundations with court entrances, underground services and drainage. Check the lowest obstruction above the entire playing area and preserve access for future inspection and maintenance.

Packaging and shipping

Canopy members and covering components add a separate packaging and handling requirement. Confirm dimensions, lifting access and storage protection for the actual order. Do not estimate container capacity from a court-only packing example.

Warranty scope

PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.

Prepare your project brief

Include the country and city, court count, available space, indoor or outdoor use, canopy requirement and target timeline. Attach drawings or site photographs where available.