Panoramic padel courts with open views and a defined steel frame.
PadelSpan factory configuration overview · 1 November 2026. Product dimensions, component options and technical details for your padel court project.
| Internal playing area | 20 × 10 m |
|---|---|
| Tempered glass | 12 mm tempered glass |
| Frame connection options | External or internal connection arrangements |
| Upper-beam section options | 100 × 50 × 3 mm or 100 × 100 × 3 mm, matched to the chosen configuration |
| Finish and surface | Structure and artificial-turf colour choices |
Compare model-specific frame layouts and specifications. Our factory prepares the component schedule and drawings for your selected configuration.
A panoramic arrangement with a 100 mm square corner post and a 100 × 50 mm upper beam. Compare the frame silhouette, connection drawing and viewing lines together.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 100 × 100 × 3 mm; height 3 m |
| Upper crossbeam | 100 × 50 × 3 mm; length 3 m |
| Lower crossbeam | 100 × 50 × 3 mm; length 3 m |
| Posts | 100 × 50 × 3 mm; height 3 m |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
The PRO configuration uses a larger upper-beam section than QF while retaining its own coordinated posts and lower crossbeam. Specify the full assembly rather than choosing by a beam size alone.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 100 × 100 × 3 mm; height 3 m |
| Upper crossbeam | 100 × 100 × 3 mm; length 3 m |
| Lower crossbeam | 100 × 50 × 3 mm; length 3 m |
| Posts | 100 × 50 × 3 mm; height 3 m |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Choose the materials, finishes and equipment for your padel court.
| Panel modules | 1 × 2 m or 1 × 4 m |
|---|---|
| Wire diameter reference | 4 mm |
| Mesh opening reference | 50 × 50 mm |
| Mesh-frame reference | 50 × 30 × 2 mm |
| Material reference | PE artificial turf |
|---|---|
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Gauge reference | 3/16; unit to be confirmed |
| Turf supply allowance | 210 m² supplied for the 200 m² internal playing area |
| Court lighting reference | 8 × 200 W LED; final fixture and pole schedule to be agreed |
|---|---|
| Fixture protection | IP65 and IP66 fixture options, selected for the venue |
| Pole shapes | Curved and angular forms; confirm mounting details |
| Fastener reference | SUS304 bolts, nuts and washers in the component schedule |
| Glass connection option | 6 mm transparent PC connecting plate; match to glass and support drawings |
Approve the selected connection arrangement and glass interfaces before foundations and anchorage are finalized. Check the finished playing level, entrance clearances and access for safe glass handling. Use the installation package matching the ordered variant.
Keep the selected variant identifiable across drawings, component labels and packing documents. Plan protected glass handling and suitable storage at the destination. Confirm the unloading method and delivery route before arranging the container movement.
PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.
Include the country and city, court count, available space, indoor or outdoor use, canopy requirement and target timeline. Attach drawings or site photographs where available.