PadelSpan
Padel Courts & Sports Equipment

Portable Padel Court

Portable padel courts with a dedicated movable base.

PadelSpan factory configuration overview · 1 November 2026. Product dimensions, component options and technical details for your padel court project.

Reference configuration

Internal playing area20 × 10 m
Configuration arrangementPadel court with a dedicated movable base platform
Tempered glass12 mm tempered glass
SurfaceArtificial turf coordinated with the selected platform
Support interfaceProject-specific surface and base assessment

Configuration options

Compare model-specific frame layouts and specifications. Our factory prepares the component schedule and drawings for your selected configuration.

Portable Platform Padel Court

A court enclosure supplied around a dedicated platform arrangement. Plan the receiving surface, access, levelling and handling together with the enclosure.

Internal playing area20 × 10 m / 200 m²
Configuration compositionPadel court + dedicated relocatable base platform
Steel member scheduleDefined by the selected platform and enclosure drawings
Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Padel court component options

Choose the materials, finishes and equipment for your padel court.

Mesh enclosure options

Panel modules1 × 2 m or 1 × 4 m
Wire diameter reference4 mm
Mesh opening reference50 × 50 mm
Mesh-frame reference50 × 30 × 2 mm

Surface options

Material referencePE artificial turf
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Gauge reference3/16; unit to be confirmed
Turf supply allowance210 m² supplied for the 200 m² internal playing area

Lighting and fixing options

Court lighting reference8 × 200 W LED; final fixture and pole schedule to be agreed
Fixture protectionIP65 and IP66 fixture options, selected for the venue
Pole shapesCurved and angular forms; confirm mounting details
Fastener referenceSUS304 bolts, nuts and washers in the component schedule
Glass connection option6 mm transparent PC connecting plate; match to glass and support drawings

Equipment scope

Options to discuss

Site and installation interfaces

Confirm surface condition, level, support requirements, access and the platform's complete external footprint with the venue team. Agree any anchorage or ballast provisions through the project design. Plan assembly, inspection and removal as separate activities with suitable personnel and handling equipment.

Packaging and shipping

Provide the delivery route, loading restrictions and available storage area. For a relocating venue, discuss how components will be protected, identified, checked and repacked after use. Reusable packaging and replacement materials should be considered explicitly in the scope.

Warranty scope

PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.

Prepare your project brief

Include the country and city, court count, available space, indoor or outdoor use, canopy requirement and target timeline. Attach drawings or site photographs where available.