PadelSpan
Padel Courts & Sports Equipment

Retractable Padel Court Canopy

Retractable padel court canopies for open or covered play.

PadelSpan factory configuration overview · 1 November 2026. Product dimensions, component options and technical details for your padel court project.

Reference configuration

Freestanding dimensions22 × 12 × 8.8 m overall (L × W × H)
Integrated dimensions20.6 × 10.6 × 8.8 m overall (L × W × H)
Roof functionMotorized opening and closing
StructureGalvanized-steel canopy arrangement
Controls and electrical scopeDefined for the selected project configuration

Configuration options

Compare model-specific frame layouts and specifications. Our factory prepares the component schedule and drawings for your selected configuration.

Integrated Retractable Padel Canopy

A motorized opening-roof arrangement with a compact footprint. Coordinate the moving roof, electrical provision, controls and maintenance access from the design stage.

Overall dimensions L × W × H20.6 × 10.6 × 8.8 m
Column section100 × 100 × 3 mm
Column height6 m
Arch rise2.8 m
OperationMotorized opening / closing with controls selected for the venue
CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

Freestanding Retractable Padel Canopy

An independent opening-roof structure with a wider perimeter footprint. Coordinate support locations, moving zones and control requirements alongside the court layout.

Overall dimensions L × W × H22 × 12 × 8.8 m
Column section120 × 120 × 3 mm
Column height6 m
Arch rise2.8 m
OperationMotorized opening / closing with controls selected for the venue
CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

Padel court component options

Choose the materials, finishes and equipment for your padel court.

Roof coordination

Clear playing heightClear playing height coordinated below the lowest roof member, light or service
LED lighting8 × 200 W LED, 6500 K; 180–220 V / 50 Hz. Electrical selection adapted to the destination.
Lighting designLighting layout coordinated for playing visibility, uniformity and mounting height
Canopy membrane750 g/m² PVDF membrane option with supporting material reports
Water and site interfacesCoordinated gutters, downpipes, drainage, foundations and maintenance access

Equipment scope

Options to discuss

Site and installation interfaces

Coordinate structural supports, foundations, power supply, isolation, controls and access for servicing. A competent local team should complete the site-specific electrical work and applicable inspections. The handover should cover the agreed operating limits and the procedure for taking the configuration out of service.

Packaging and shipping

The packing and arrival plan must account for structural members, covering and electrical or control components. Keep sensitive components protected and identifiable. Confirm the order-specific packing schedule and available unloading equipment before dispatch.

Warranty scope

PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.

Prepare your project brief

Include the country and city, court count, available space, indoor or outdoor use, canopy requirement and target timeline. Attach drawings or site photographs where available.