An independent opening-roof structure with a wider perimeter footprint. Coordinate support locations, moving zones and control requirements alongside the court layout.
Configuration focus: Independent motorized roof configuration


| Overall dimensions L × W × H | 22 × 12 × 8.8 m |
|---|---|
| Column section | 120 × 120 × 3 mm |
| Column height | 6 m |
| Arch rise | 2.8 m |
| Operation | Motorized opening / closing with controls selected for the venue |
| Covering | PVDF membrane with material-specific technical documentation |
|---|---|
| Playing clearance | Playing clearance measured below the lowest roof member, light or service |
| Site design | Project-specific support foundations, loading and drainage |
Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.