Club & economy padel courts, manufactured for everyday play.
PadelSpan factory configuration overview · 1 November 2026. Product dimensions, component options and technical details for your padel court project.
| Internal playing area | 20 × 10 m |
|---|---|
| Tempered glass | 12 mm tempered glass |
| Corner-column options | Paired 80 × 60 × 3 mm; 80 × 80 × 3 mm; 80 × 80 × 2.5 mm; or Classic paired 100 × 50 × 3 mm, according to configuration |
| Surface | Artificial turf with colour options |
| Lighting | LED arrangement confirmed with the equipment schedule |
Compare model-specific frame layouts and specifications. Our factory prepares the component schedule and drawings for your selected configuration.
A paired-profile enclosure for projects comparing the frame layout and equipment scope of a club court.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 80 × 60 × 3 mm × 2; paired profiles |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
A square-column court configuration with a defined corner-post section and a complete glass, mesh, surface and lighting package.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 80 × 80 × 3 mm |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
A separate enclosure specification using the 2.5 mm corner-post wall thickness. Compare its actual member schedule with Economy A and B.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 80 × 80 × 2.5 mm |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
A classic framed enclosure with paired corner profiles and a separately specified mesh frame. Coordinate the visible supports with padding and entrance details.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 100 × 50 × 3 mm paired profiles; height 3 m |
| Mesh frame | 50 × 30 × 2 mm |
| Lighting poles | 100 × 50 × 3 mm; height 3 m |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Choose the materials, finishes and equipment for your padel court.
| Panel modules | 1 × 2 m or 1 × 4 m |
|---|---|
| Wire diameter reference | 4 mm |
| Mesh opening reference | 50 × 50 mm |
| Mesh-frame reference | 50 × 30 × 2 mm |
| Material reference | PE artificial turf |
|---|---|
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Gauge reference | 3/16; unit to be confirmed |
| Turf supply allowance | 210 m² supplied for the 200 m² internal playing area |
| Court lighting reference | 8 × 200 W LED; final fixture and pole schedule to be agreed |
|---|---|
| Fixture protection | IP65 and IP66 fixture options, selected for the venue |
| Pole shapes | Curved and angular forms; confirm mounting details |
| Fastener reference | SUS304 bolts, nuts and washers in the component schedule |
| Glass connection option | 6 mm transparent PC connecting plate; match to glass and support drawings |
Coordinate the selected base plates, anchors and court footprint with the local foundation design. The installing contractor should confirm levels, drainage, access and electrical provision before delivery. Installation documentation must match the ordered configuration; a generic playing-area diagram is not a foundation drawing.
Agree the packing list, component identification and unloading method before shipment. Glass, steel members, turf and small fittings require different handling. Container capacity and shipment weight depend on the confirmed order and packaging arrangement.
PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.
Include the country and city, court count, available space, indoor or outdoor use, canopy requirement and target timeline. Attach drawings or site photographs where available.