A square-column court configuration with a defined corner-post section and a complete glass, mesh, surface and lighting package.
Configuration focus: 80 × 80 × 3 mm square corner posts

| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 80 × 80 × 3 mm |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.