WPT-style tournament padel courts for indoor, outdoor and covered venues. Choose classic exposed corner posts or a panoramic hidden-corner design, with a complete factory-made equipment package.
PadelSpan factory configuration overview · 1 November 2026. Product dimensions, component options and technical details for your padel court project.
| Internal playing area | 20 × 10 m |
|---|---|
| Tempered glass | 12 mm tempered glass |
| Corner structure options | Classic exposed posts / Panoramic hidden-corner connections |
| Surface | Artificial turf with colour options |
| Lighting | Position and fixture specification coordinated for the project |
Compare model-specific frame layouts and specifications. Our factory prepares the component schedule and drawings for your selected configuration.
Our WPT tournament-style panoramic padel court combines open glass corners, a 20 × 10 m playing area and 12 mm tempered glass. Manufactured for indoor, outdoor or covered venues, with custom frame colours, turf and lighting.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Lighting poles | 60 × 60 × 3 mm; height 3 m |
| Light-pole columns | 100 × 50 × 3 mm; height 3 m |
| Mesh frame | Section defined in the model fabrication drawing |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
An open-view arrangement with suspended upper enclosure details. Review the glass interfaces and upper mesh support as a coordinated assembly.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Posts | 100 × 50 × 3 mm; height 3 m |
| Mesh frame | 50 × 30 × 2 mm |
| Lighting poles | 100 × 100 × 3 mm; height 3 m |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Choose the materials, finishes and equipment for your padel court.
| Panel modules | 1 × 2 m or 1 × 4 m |
|---|---|
| Wire diameter reference | 4 mm |
| Mesh opening reference | 50 × 50 mm |
| Mesh-frame reference | 50 × 30 × 2 mm |
| Material reference | PE artificial turf |
|---|---|
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Gauge reference | 3/16; unit to be confirmed |
| Turf supply allowance | 210 m² supplied for the 200 m² internal playing area |
| Court lighting reference | 8 × 200 W LED; final fixture and pole schedule to be agreed |
|---|---|
| Fixture protection | IP65 and IP66 fixture options, selected for the venue |
| Pole shapes | Curved and angular forms; confirm mounting details |
| Fastener reference | SUS304 bolts, nuts and washers in the component schedule |
| Glass connection option | 6 mm transparent PC connecting plate; match to glass and support drawings |
Glass supports and connections must follow the approved configuration. Coordinate the local support and anchorage design, safe handling method and erection sequence before delivery. Spectator routes and any event-specific access requirements should be resolved alongside the court layout.
Plan protection and identification for glass, structural members and fittings. Include the destination's lifting access, staging area and installation sequence when discussing packaging. Final packing dimensions and container requirements are order-specific.
PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.
Include the country and city, court count, available space, indoor or outdoor use, canopy requirement and target timeline. Attach drawings or site photographs where available.