Our WPT tournament-style panoramic padel court combines open glass corners, a 20 × 10 m playing area and 12 mm tempered glass. Manufactured for indoor, outdoor or covered venues, with custom frame colours, turf and lighting.
Configuration focus: WPT tournament-style panoramic design with open glass-corner views

| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Lighting poles | 60 × 60 × 3 mm; height 3 m |
| Light-pole columns | 100 × 50 × 3 mm; height 3 m |
| Mesh frame | Section defined in the model fabrication drawing |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Factory drawings identify the corner connections, glass fixings, mesh-frame sections and lighting arrangement for this WPT model.