A compact one-piece arch canopy arrangement. Coordinate the roof supports and court interfaces with the site layout before defining foundations.
Configuration focus: 20.6 × 10.6 m reference footprint


| Overall dimensions L × W × H | 20.6 × 10.6 × 8.8 m |
|---|---|
| Column section | 100 × 100 × 3 mm |
| Column height | 6 m |
| Arch rise | 2.8 m |
| Covering | PVDF membrane with material-specific technical documentation |
|---|---|
| Playing clearance | Playing clearance measured below the lowest roof member, light or service |
| Site design | Project-specific support foundations, loading and drainage |
Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.