Fixed Padel Court Canopy / FACTORY DIRECT

Integrated Arch Padel Canopy

A compact one-piece arch canopy arrangement. Coordinate the roof supports and court interfaces with the site layout before defining foundations.

Configuration focus
20.6 × 10.6 m reference footprint
Overall roof envelope
20.6 × 10.6 × 8.8 m
Request this modelDownload model specification PDFBuild a court + roof package

IS THIS THE RIGHT FIT?

Start with the way your venue will be used.

01

Regular covered play

Permanent roof coverage for padel clubs and resorts that need shelter from direct sun and rain.

02

Integrated or freestanding

Compare the compact integrated arch, wider freestanding arch and pitched A-frame arrangements.

03

Plan the space around the court

Roof supports, entrances, lighting, runoff and maintenance routes are coordinated on the site drawing.

DESIGN & CONFIGURATION

The structure. The covering. The space.

A compact one-piece arch canopy arrangement. Coordinate the roof supports and court interfaces with the site layout before defining foundations.

The roof structure and membrane work as one package. Define the support spacing, edge connections, drainage route and lighting positions together. The product dimensions describe an exterior envelope; the court needs a separate clearance review.

For an existing venue, provide a measured layout and photographs of the approach and surrounding structures. This helps coordinate unloading, assembly access and local works with the proposed canopy.

PRODUCT VISUALIZATIONS

Explore the design from every angle.

Review the dimensioned structure and the covered appearance together.

Colours & custom design

ROOF APPLICATION & INSTALLATION

See the application context.

See the roof structure, covering and support arrangement across different installations. The captions identify the photographed application.

TECHNICAL SPECIFICATIONS

Specifications for this model.

Keep these values together as a configuration. Final dimensions, quantities and interfaces follow the approved equipment schedule.

Download model PDF
Structure & geometry
Overall dimensions L × W × H20.6 × 10.6 × 8.8 m
Column section100 × 100 × 3 mm
Column height6 m
Arch rise2.8 m
Membrane & site interfaces
CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

COMPONENTS & MANUFACTURING

Connect the specification to the details.

Full component reference

YOUR FINISHING SCHEDULE

Coordinate the roof with your venue.

Choose the structural finish, roof arrangement and membrane. Include lighting positions, drainage connections and any side covering in the proposal.

White membrane sheet samples with visible fabric backing

FROM DRAWING TO ARRIVAL

Define the package before production.

Connect component identification to the approved drawings and packing list. Agree protection for finished members, fragile glass and smaller fitting kits, with unloading and storage planned at the receiving site.

Include in the model brief

  • Measured court and canopy layout with support positions
  • Local loading requirements and foundation interfaces
  • Membrane product, seams, perimeter connections and drainage
  • Lighting and electrical coordination, access and maintenance scope

FROM CONFIGURATION TO SETTING

See a related arrangement.

Explore our padel court installations, from outdoor clubs to covered venues.

All padel projects

MADE, CHECKED & PACKED IN OUR FACTORY

Know what happens before the equipment reaches your site.

Bundled steel members and wrapped components ready for transport

Bundled steel members and wrapped components prepared for transport.

Inside our Hebei factory
Production and delivery records
StageWhat we coordinateYour project record
Before manufactureModel, quantities, finish and component interfacesApproved drawing and equipment schedule
During fabricationMember dimensions, connections and surface finishInspection and material identification
Before dispatchProtected parts, glass packing and fitting kitsPacking list and component labels
At installationAssembly sequence, tools and site interfacesInstallation information and technical support
During operationMaintenance questions and replacement componentsPart identification and five-year quality warranty

YOUR TECHNICAL DOCUMENT PACK

From product selection to a clear equipment schedule.

Download the model specification, review the relevant material records and bring the site information into the drawing discussion.

Download language: English

PLANNING & HANDOVER

Padel equipment delivery checklist

Drawing register, material schedule, packing identification and installation handover checklist.

Download checklist

BEFORE YOU ORDER

Questions about this configuration.

How much space does the integrated arch canopy occupy?

The catalogue roof envelope is 20.6 × 10.6 × 8.8 m, with 100 × 100 × 3 mm columns. These are overall dimensions; usable playing clearance is measured below the lowest roof member, light or service.

Is the roof’s overall height the playing clearance?

No. Overall height describes the roof envelope. Playing clearance is the unobstructed height below the lowest member, lighting fixture or service across the playing area. We show both references on the coordinated project drawings.

Can you supply the court and roof together?

Yes. PadelSpan manufactures padel courts and fixed or retractable canopies. We coordinate the selected enclosure, roof supports, lighting and drainage interfaces in one equipment proposal.

Which documents and support come with the proposal?

We prepare the selected model specification, layout and equipment schedule, followed by packing and assembly information for the order. Our factory provides installation guidance, spare-part identification and a five-year product quality warranty under the published terms.

MODEL BY MODEL

Compare within this family.

Compare the visible arrangement and its specific equipment schedule.

Compare models

DIRECT FROM OUR FACTORY

Get a quote for your integrated arch padel canopy.

Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.

  1. Model and finish schedule
  2. Drawings and site interfaces
  3. Itemized equipment and packing scope
Vicky ZhangSenior Project Managervicky@padelspan.comDiscuss this product
Planning the whole investment? Open the cost & ROI calculator →

Request your equipment proposal

Selected model: Integrated Arch Padel Canopy

Fields marked * are required.

Contact and project details
Add drawings or a detailed brief →

Your enquiry is emailed to our sales team.

Request a QuoteWhatsApp