THREE TURF OPTIONS

Padel Court Artificial Turf: Compare Three Options

Choose between CC, Upgrade and Match turf for your padel court package. Compare the complete specification with the sample, then record the chosen turf and colour in your equipment quotation.

Specification updated:

CC turf

12 mm pile with a listed density of 52 500 / m² and a 9000D yarn entry.

Upgrade turf

The same listed pile height as CC, with a higher declared density and a 9500D yarn entry.

Match turf

10 mm pile with a listed density of 46 200 / m² and a 13500D yarn entry.

Three turf options, side by side

Compare each option by its own column. These are the current supplied parameters for selection and quotation.

Scroll the table sideways on smaller screens.

PadelSpan supplied turf comparison
ParameterCC turfUpgrade turfMatch turf
Fibre materialPEPEPE
Available turf coloursBlue / Green / Brick-redBlue / Green / Brick-redBlue / Green / Brick-red
Turf pile height12 mm12 mm10 mm
Stitch rate25 / 10 cm25 / 10 cm25 / 10 cm
Gauge as listed3/163/163/16
Declared density52 500 / m²63 000 / m²46 200 / m²
Yarn entry as supplied9000D9500D13500D

Confirm the units and selected sample

The gauge is listed as 3/16 without a unit. The yarn column is headed DTEX but its entries end in D. Confirm these two units in the order specification; the yarn entries are not turf weight per square metre.

All three options list the same stitch rate and gauge but different densities. The table preserves the declared values; confirm the complete construction specification with the selected sample before production.

Sample photographs show fibre appearance. The pink tone in the Match sample is not an additional listed order colour. Blue, green and brick-red are the current choices for all three options.

Choose a complete surface specification

Pile height, density and yarn specification describe different parts of the surface. A higher number alone does not establish faster play, longer life or a better court. Compare a physical sample and the complete installation specification against the venue's use and maintenance plan.

Review the complete court specification

Confirm the installation package

Record the turf option, colour, roll layout, line markings and supplied area. Confirm backing, drainage compatibility, infill material and quantity, joining tape, adhesive and installation responsibilities in the quotation. These items are not specified by the comparison table and should not be assumed included.

Coordinate the base and drainage

DOCUMENTATION BY COMPONENT

Component certificates & reports

Contact our team about the documentation relevant to your selected equipment.

  • Artificial turf · FEP documentation
Include documents in my technical proposal

Add your turf choice to an enquiry

Turf option
Turf colour

Select an option, or ask us to help compare samples.

Request this turf configuration

Your selection is added to the editable enquiry brief. No order is placed here.

STEEL FRAME FINISH

Seven standard frame colour references

The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.

Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

  • RAL 9003White
  • RAL 1016Yellow
  • PMS 376CLime green
  • RAL 5015Blue
  • RAL 9005Black
  • RAL 2008Orange
  • RAL 5005Dark blue
Choose frame colour and custom details

Questions before ordering

Is Match turf automatically certified for tournaments?

Match is the name of this supply option. The comparison table provides no competition certificate or test report. Confirm any event-specific surface requirement and supporting documentation before ordering.

Can I select turf independently of the court frame?

Yes. Select the court model, turf option and surface colour separately, then coordinate them in one equipment schedule. The frame colour is a separate choice with its own colour reference.

Request a QuoteWhatsApp