ABOUT COURTSPAN
CourtSpan. Padel manufacturing & project expertise.
CourtSpan is a padel court and sports equipment manufacturer in Hebei, China. We combine steel fabrication, custom finishes, technical coordination and export delivery for clubs, contractors, resorts and distributors.
HEBEI MANUFACTURING BASE
The people and production behind your padel court.
Steel fabrication, finishing and export preparation come together at our Hebei factory. CourtSpan connects manufacturing capability with the practical details of your project.
Inside our padel court factory
- Production lines
- 8
- Production equipment units
- 85
- Warehouse area
- 3,000 m²
- Production workshop area
- 12,000 m²
1,500 padel court sets annual production capacity
Explore the manufacturing processBuy your padel court direct from the factory.
A direct connection from your project brief to the production floor, with a clear equipment scope and a team to contact after delivery.
Direct technical communication
Connect your project questions with the people preparing the drawings and manufacturing the components.
Made around your brief
Specify the padel court model, frame finish, turf, lighting and branding with our factory team.
Production you can follow
Connect the agreed specification with fabrication, inspection documents and identified packing.
Support after delivery
Reach the factory for installation guidance, replacement-part identification and five-year quality warranty support.

YOUR PROJECT CONTACT
Meet Vicky Zhang.
Senior Project Manager · CourtSpan
Your point of contact for padel court selection, customisation, production coordination and overseas delivery support. A direct conversation helps turn your site information and commercial goals into a clear equipment brief.
Manufactured around your project.
A court is a set of connected decisions. The enclosure affects the playing experience and views across a venue. Turf and lighting affect daily use. Foundations, drainage and access shape the installation. CourtSpan brings those questions into the equipment conversation so buyers can understand what they are selecting and what their local project team needs to prepare.
Our range centres on Club & Economy, Panoramic, WPT Tournament and Portable padel court families, alongside fixed and retractable canopies. Each family provides a starting configuration. The final specification follows the site, intended use, selected components and agreed scope. We help organize those inputs into a brief that can be reviewed, quoted and carried through to the order documents.

A practical conversation for every buyer.
Contractors need coordinated drawings and clear interfaces with local works. Club operators need a maintainable specification and an opening plan connected to delivery and site readiness. Hotels need courts that work with guest routes, landscape and venue operations. Distributors need consistent configurations and clear support responsibilities. Temporary venues need a plan for arrival, use and removal. These priorities guide the questions we ask.
Customization starts with defined choices: structure and turf colours, lighting arrangements, protective accessories and approved branding positions. Changes to the structure or component interfaces need a separate review. Recording the selected configuration keeps the visual concept, quotation and equipment schedule aligned.
Documentation that stays useful.
We encourage buyers to keep drawings, component references and packing information together. Those records help the installation team prepare and make future maintenance or replacement enquiries more precise. Supporting test reports and attestations should be read with their named holder and scope intact, then matched to the selected equipment.
Delivery planning also needs a local view. Site access, unloading equipment, protected storage, foundations, drainage and electrical work should have clear owners before equipment arrives. The quotation and project plan are the place to establish those responsibilities, along with component-specific warranty and maintenance terms.
Start with Vicky and your site.
Vicky Zhang is your project contact for court selection and quotation discussions. Share the location, court count, available space and intended timeline. You do not need every detail resolved before the first conversation; identify what is known and what still needs review. Our listed contact locations are the Hebei Manufacturing Base, Hebei Office and Guangzhou Office.
YOUR NEXT STEP
Tell us what you want to build.
Share your location, court count and what you have in mind. Vicky will help shape the equipment brief.