Padel courts

Panoramic Padel Court

Panoramic padel courts with open views and a defined steel frame.

Internal playing area
20 × 10 m
Tempered glass
12 mm tempered glass
Frame connection options
External or internal connection arrangements

IS THIS THE RIGHT FIT?

Start with the way your venue will be used.

01

A clear view into the game

Glass-focused padel courts for clubs, hospitality venues and spectator-facing locations.

02

QF or PRO

QF and PRO use different upper crossbeams. Review the full frame, connection details and site layout together.

03

Colours that belong together

Coordinate the steel finish, turf and light-pole style with the wider venue.

The project fit

Look beyond the playing lines.

PadelSpan manufactures panoramic padel courts with broad glass panels and a clearly defined steel frame. The 20 × 10 m playing area combines 12 mm tempered glass, framed mesh, artificial turf, centre net and LED lighting for clubs, resorts and commercial sports venues.

Choose QF or PRO construction to suit the intended appearance and structural arrangement. Their upper-beam profiles distinguish the two models. Internal or external connection details, frame colours, turf colours and light-pole styles are coordinated in the selected configuration.

Our factory prepares the steelwork, surface finish and component package around the approved drawings. We work with your installation team on the footprint, anchors, glass supports and access requirements, then provide a clearly identified shipment and remote installation support.

MODEL BY MODEL

Explore the models in this family.

Compare the visible arrangement and its specific equipment schedule.

Compare models

CONFIGURATION BY CONFIGURATION

Choose the structure. Define the details.

Compare families

Each option has its own structure and interfaces. Final dimensions and equipment follow the selected order drawings.

SELECTED CONFIGURATION

Panoramic QF Padel Court

A panoramic arrangement with a 100 mm square corner post and a 100 × 50 mm upper beam. Compare the frame silhouette, connection drawing and viewing lines together.

Structure & geometry
Internal playing area20 × 10 m / 200 m²
Corner posts100 × 100 × 3 mm; height 3 m
Upper crossbeam100 × 50 × 3 mm; length 3 m
Lower crossbeam100 × 50 × 3 mm; length 3 m
Posts100 × 50 × 3 mm; height 3 m
Surface, glass & equipment
Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

Panoramic QF · product and colour visualizations
Product visualization. Panoramic QF · product and colour visualizations

MATERIALS & CONNECTIONS

The details behind the configuration.

All components

External or internal connection?

The two photographs illustrate different beam-to-column connections. The corresponding beam sections are specified separately in the configuration selector.

Glass connections

A transparent connecting plate links adjacent glass panels. The component reference specifies reinforced PC, 6 mm thick. Match the hole pattern, bolts and supporting structure to the selected glass-fixing schedule.

Glass panel schedule

Our glass schedule identifies panel width, height, thickness, hole positions, edge treatment and fixing details. Each panel is matched to the selected frame and packing sequence.

Lighting selection

Select 200 W LED fixtures, light-pole shapes and mounting positions for the venue. IP65 and IP66 options are coordinated with the electrical supply and lighting layout.

FACTORY CONFIGURATION OPTIONS

The details that complete your padel court.

Choose the enclosure, playing surface and lighting to match your venue. We bring the selected components together in your manufacturing drawings and equipment schedule.

Mesh enclosure options

Panel modules
1 × 2 m or 1 × 4 m
Wire diameter reference
4 mm
Mesh opening reference
50 × 50 mm
Mesh-frame reference
50 × 30 × 2 mm

Surface options

Material reference
PE artificial turf
Turf pile-height options
CC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Density options
CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Gauge reference
3/16; unit to be confirmed
Turf supply allowance
210 m² supplied for the 200 m² internal playing area

Lighting and fixing options

Court lighting reference
8 × 200 W LED; final fixture and pole schedule to be agreed
Fixture protection
IP65 and IP66 fixture options, selected for the venue
Pole shapes
Curved and angular forms; confirm mounting details
Fastener reference
SUS304 bolts, nuts and washers in the component schedule
Glass connection option
6 mm transparent PC connecting plate; match to glass and support drawings

YOUR FINISHING SCHEDULE

Give the padel court your club identity.

Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.

The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.

Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

Seven padel frame colour references. Logo-free illustration; approve the physical finish sample before production.

CHOOSE YOUR PLAYING SURFACE

Three turf options for your padel court

Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.

CC turf: original brick-red sample photograph.CC turf12 mm · 52 500 / m²
Upgrade turf: original blue sample profile.Upgrade turf12 mm · 63 000 / m²
Match turf: original sample profile; select order colours from the specification table.Match turf10 mm · 46 200 / m²
Compare turf specifications and samples

FROM CONFIGURATION TO SETTING

See a related arrangement.

Explore our padel court installations, from outdoor clubs to covered venues.

All padel projects

Define your equipment

Equipment scope & project choices

Compare court families

Keep the supply scope explicit.

Choose the structural configuration above, then record the selected components, site interfaces and exclusions in one equipment schedule. Review the final drawings with your local project team before construction.

Printable configuration overview

Equipment included

  • Panoramic steel and glass enclosure
  • Framed mesh sections and entrance arrangement
  • Artificial turf and court markings
  • Centre net and posts
  • Coordinated lighting and connection components

Make it fit your project

  • Internal or external frame connections
  • Structure colour and turf colour
  • Light-pole configuration
  • Entrance padding and branding
  • Canopy coordination
Explore customizationSpecify entrance & net-post safety padding

From specification to site

Prepare for a coordinated delivery.

Installation interfaces

Approve the selected connection arrangement and glass interfaces before foundations and anchorage are finalized. Check the finished playing level, entrance clearances and access for safe glass handling. Use the installation package matching the ordered variant.

Installation supportCompare the three installation structures

Packing & arrival

Keep the selected variant identifiable across drawings, component labels and packing documents. Plan protected glass handling and suitable storage at the destination. Confirm the unloading method and delivery route before arranging the container movement.

Shipping & packaging

Support & warranty terms

PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.

Component warranty: Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.

Five-year warranty & factory supportAfter-sales support

Explore factory-direct padel court supply

Calculate your padel court project budget →

MADE, CHECKED & PACKED IN OUR FACTORY

Know what happens before the equipment reaches your site.

Protected wooden crates secured inside a shipping container

Protective timber crates secured inside a shipping container.

Inside our Hebei factory
Production and delivery records
StageWhat we coordinateYour project record
Before manufactureModel, quantities, finish and component interfacesApproved drawing and equipment schedule
During fabricationMember dimensions, connections and surface finishInspection and material identification
Before dispatchProtected parts, glass packing and fitting kitsPacking list and component labels
At installationAssembly sequence, tools and site interfacesInstallation information and technical support
During operationMaintenance questions and replacement componentsPart identification and five-year quality warranty

YOUR TECHNICAL DOCUMENT PACK

From product selection to a clear equipment schedule.

Download the model specification, review the relevant material records and bring the site information into the drawing discussion.

Download language: English

PLANNING & HANDOVER

Padel equipment delivery checklist

Drawing register, material schedule, packing identification and installation handover checklist.

Download checklist

Practical answers

Questions before you order

What is the difference between internal and external frame connections?

The connection details sit differently in relation to the adjoining frame members. This affects the visual arrangement and assembly detail. Request the relevant drawing rather than assuming that two panoramic photographs show the same connection configuration.

Does a larger upper-beam section automatically give a higher wind rating?

No single section size establishes a complete structure's rating. Connections, supports, exposure and the full design matter together. Any required project loading should be reviewed for the selected complete configuration.

Will my court match the pictured configuration?

The photograph shows a panoramic configuration. Colour, lights and details may differ from your order. Use it to communicate preferences, then confirm the actual configuration in the quotation and drawings.

Can the court be combined with a fixed or retractable canopy?

A canopy can be considered during the layout stage. Court and canopy supports, clear height, drainage, electrical services and maintenance access need to be coordinated as one project, even when the structures are supplied separately.

What should I check when replacing a glass panel later?

Provide the original order reference, panel position, dimensions, hole pattern and photographs. Thickness alone is insufficient to identify a replacement. Preserve the final drawing and component schedule with your maintenance records.

Which details should an installer review before ordering?

Review the base-plate layout, connection method, glass fixing details, entrance arrangement and lighting interfaces. Resolve any differences between the site drawing and the equipment layout before manufacture begins.

DIRECT FROM OUR FACTORY

Get a quote for your panoramic padel court.

Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.

  1. Model and finish schedule
  2. Drawings and site interfaces
  3. Itemized equipment and packing scope
Vicky ZhangSenior Project Managervicky@padelspan.comDiscuss this product
Planning the whole investment? Open the cost & ROI calculator →

Request your equipment proposal

Fields marked * are required.

Contact and project details
Add drawings or a detailed brief →

Your enquiry is emailed to our sales team.

Request a QuoteWhatsApp