SQUASH COURTS

Glass Squash Courts

Coordinate glass panels, fittings, playing floor and venue space as one squash court. Review the singles-court layout, indoor and covered applications, and the details needed for a project quotation.

Singles playing footprint
9.75 × 6.40 m
Coordinated enclosure
Glass + fittings
Minimum clear-height reference
5.64 m
Blue glass squash court with structural glazing fins and wooden playing floor
Glass squash court with a clear-view enclosure.

CHOOSE YOUR CONFIGURATION

Glass squash courts, planned around the complete playing environment.

PadelSpan manufactures squash court enclosures with tempered glass and metal fittings, coordinated with the wooden playing floor. A singles court has a 9.75 × 6.40 m playing area. Our project team plans glazing supports, entrance access, lighting, overhead clearance and the floor build-up with the venue layout. Indoor and covered configurations let clubs, hotels and sports developments select an arrangement suited to the location.

Blue glass squash court with structural glazing fins and wooden playing floor
01

All-glass squash court

A transparent enclosure gives clear views into the playing area. Coordinate glazing joints, supporting fins, doors, wall markings and lighting with the floor and venue layout.

Consider forClubs and sports venues planning a visible glass-court installation.
Glass squash enclosure beneath a white canopy with green structural columns
02

Covered venue integration

A glass squash enclosure can be coordinated with a separate shelter. We review clearance below roof members and lights, ventilation, floor conditions and player access in the venue layout.

Consider forProjects combining a squash enclosure with a dedicated covered area.
Outdoor glass squash court with sloping out-lines and overhead lighting
03

Outdoor glass-court reference

Outdoor layouts coordinate glazing support, weather exposure, drainage, the playing surface and maintenance access. The equipment package is selected for the location and intended operation.

Consider forSite-specific feasibility discussions for outdoor sport facilities.

TECHNICAL SPECIFICATIONS

Know what you are specifying.

Review the equipment schedule alongside your venue layout. The agreed drawing and quotation define the final supply scope.

Glass Squash Courts — specification and planning reference
Internal singles-court length9,750 mmMeasured between playing surfaces.
Internal singles-court width6,400 mmMeasured between playing surfaces.
Minimum clear-height reference5,640 mmAbove the finished playing floor, clear of lights and other obstructions.
Front-wall out-line4,570 mmFloor to lower edge of the front-wall line.
Back-wall out-line2,130 mmFloor to lower edge of the back-wall line.
Front-wall service line1,780 mm to lower edgeA 50 mm line gives an upper edge at 1,830 mm; use the specified measurement edge.
Tin height reference480 mmFloor to the upper edge; confirm the intended event or playing specification.
Short-line position4,260 mm from back wallMeasured to the nearest edge of the short line.
Service box1,600 mm internal squareFloor marking dimension.
Enclosure & connectionsTempered glass + metal fittingsGlass thickness, panel schedule and connection specification are project-specific.
Playing floorWooden sports flooringFloor configuration, substrate and environmental requirements must be coordinated.

Playing dimensions above use World Squash technical references. They do not establish product certification or venue approval. The building footprint must also allow for glazing supports, access and the complete floor assembly; confirm current local and event requirements before construction.

World Squash technical reference · Appendix 7

CUSTOMIZATION & PROJECT SCOPE

Configure the details that matter.

Explore OEM & ODM
01

Glass & support structure

Confirm the panel layout, glass specification, supporting structure and access door as one coordinated package.

02

Playing floor

Agree the floor construction, finished level and substrate preparation. The material must suit the actual indoor or exposed environment.

03

Lighting & visibility

Coordinate light positions with the clear-height envelope, reflections and visibility through the glass.

04

Venue & installation scope

Define whether the project is inside an existing building or within a new shelter, together with access for delivery and glass handling.

APPLICATIONS

Plan for your venue.

Equipment choices work best when they reflect the people, space and daily operation of the facility.

Racket-sports clubs

Add squash to a venue programme that may also include padel and pickleball, while keeping each sport's technical requirements separate.

Hotels & fitness facilities

Review the guest circulation, viewing position, indoor climate and maintenance access around the court.

Dedicated sports developments

Coordinate the glass enclosure with the architect, structural designer and local installation team from the start.

FROM BRIEF TO HANDOVER

A coordinated route to installation.

Explore project delivery
  1. 01

    Confirm the venue envelope

    Check the internal playing footprint, obstruction-free height, external supports and access space.

  2. 02

    Coordinate technical drawings

    Agree glazing, fittings, doors, markings, flooring and lighting interfaces.

  3. 03

    Prepare the delivery plan

    Confirm packing, unloading access, safe glass handling and installer responsibilities.

  4. 04

    Review the completed configuration

    Check the agreed dimensions and installation details, then establish glazing, fittings and floor maintenance routines.

BEFORE YOU ORDER

Your questions, answered.

Need a detail specific to your site? Include it in the project enquiry.

Speak with our team
How much space is required for a singles squash court?

The internal playing footprint is 9.75 × 6.40 m. This excludes any external structural supports, circulation and wall build-up. A site plan should also allow for the access route, door and maintenance space.

Can a 5 m high building accommodate the stated squash court?

The World Squash technical reference gives a minimum clear height of 5.64 m above the playing floor. This means clear space below the lowest light, beam or other obstruction, not just the nominal building height.

How are the service-line dimensions measured?

The reference dimension is 1.78 m to the lower edge of a 50 mm front-wall service line, giving an upper edge at 1.83 m. The drawing must state which edge is being measured.

How do you prepare a squash court for competition requirements?

Share the intended event requirements and required product documentation at the design stage. We coordinate the enclosure, floor, line positions, access and technical file for review by the project team and event organizer.

Can a glass squash court be installed outdoors?

Yes, covered and outdoor configurations are part of the range. We coordinate the glass supports, drainage, floor selection, lighting and maintenance for the location. Indoor wooden sports flooring is specified for the suitable enclosed environment.

What is included in a squash court quotation?

The quotation should identify the glass and fitting package, floor scope, doors and markings, packing, delivery terms and installation responsibilities. Structural works, shelters, building services and local approvals need explicit scope agreement.

LET’S DEFINE YOUR PROJECT

Turn your site requirements into an equipment brief.

Share the destination, quantity and site information. Vicky Zhang, Senior Project Manager, will help coordinate the next specification step.

  • Internal space, finished-floor level and clear-height survey
  • Indoor, covered or outdoor location and environmental conditions
  • Glass-enclosure preference, access and spectator requirements
  • Flooring scope, lighting plan and installation destination
Request a Squash Court Quote
Request a QuoteWhatsApp