CERTIFICATES & TEST REPORTS

Padel product certificates & technical reports.

Supporting reports and documentation are available for our court materials, glazing and canopy systems.

Galvanized steel inspection

Steelwork

Galvanized steel inspection

Galvanized wire inspection

Mesh & enclosure

Galvanized wire inspection

Tempered glass inspection

Glass panels

Tempered glass inspection

Padel canopy design patent

Roof design

Padel canopy design patent

Product attestation

Product documentation

Product attestation

Membrane environmental testingMembrane environmental testingMembrane environmental testingMembrane environmental testingMembrane environmental testing

Canopy membrane

Membrane environmental testing

Membrane physical propertiesMembrane physical propertiesMembrane physical propertiesMembrane physical propertiesMembrane physical properties

Canopy membrane

Membrane physical properties

Membrane fire-performance testingMembrane fire-performance testingMembrane fire-performance testingMembrane fire-performance testingMembrane fire-performance testing

Canopy membrane

Membrane fire-performance testing

DOCUMENTATION BY COMPONENT

Component certificates & reports

Contact our team about the documentation relevant to your selected equipment.

  • Tempered glass · CE documentation
  • Artificial turf · FEP documentation
  • LED fixtures · IP66 & EMC standards
  • Structural & lighting project requirements
Include documents in my technical proposal

Discuss documentation needs

Contact our team about the documentation relevant to your selected equipment.

Contact our team
Request a QuoteWhatsApp