PadelSpan after-sales

Padel court after-sales, direct from the factory.

A five-year product quality warranty, installation guidance and replacement-part support from PadelSpan. Keep your padel courts ready for everyday play with a clear service route to our manufacturing team.

5YEAR

Product quality
warranty

Installation-stage reference photograph of a blue court and its enclosure
Padel court installation · enclosure and surface work coordinated on site.

A CLEAR COMMITMENT

Five-year quality warranty.

PadelSpan provides a five-year product quality warranty. Our support team connects your enquiry with the manufacturing records, identifies the affected component and coordinates the appropriate remedy for the reported issue.

Component warranty: Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.

Meet the factory behind your court
Warranty and ongoing support
Support areaOur commitment
Product quality5-year warrantyQuality issues are reviewed against the supplied equipment and order records.
Installation guidanceFactory technical supportAssembly information, component identification and remote help for your local installation team.
Replacement componentsMatched to your courtGlass, mesh, fittings, net parts and other supplied equipment identified through the model and drawings.
Care and maintenanceComponent-specific guidancePractical care information for steelwork, glass, turf, lighting and optional roof equipment.

QUALITY BEFORE DISPATCH

The service record starts in production.

Certificates & technical reports
Yellow coated steel court components bundled in a workshop

Materials and fabrication

The selected steel profiles, dimensions and connection details are linked to the court drawings. Cutting, welding and finishing follow the same equipment schedule.

Explore our production process
Transparent PC plate and bolted connection at the edge of a glass panel

Glass and component records

Panel sizes, holes, fittings and supporting documents stay with the order. Those records help installers assemble the court and help us identify parts later.

See the material specifications
Bundled steel members and wrapped components ready for transport

Protection before dispatch

Glass is packed separately, coated members are protected and fitting kits are identified. The packing list connects each delivery package with its installation position.

See packing and shipment details

WHEN YOU NEED US

A direct route from the court to the factory.

Clear information helps us identify the part, understand the issue and coordinate the next step.

  1. 01

    Identify the court and component

    Send your order reference, project location, court model and the affected part. For a multi-court venue, identify the specific court or position.

  2. 02

    Show us the issue

    Add a full-view photograph, close-ups and a short description of when the issue appeared. Include labels, relevant measurements and video where movement or operation is involved.

  3. 03

    Review with the factory

    Our team checks the information against the manufacturing and installation records. We explain any further information needed and discuss the appropriate technical response.

  4. 04

    Coordinate the next action

    We confirm the agreed remedy, replacement identification or care instructions with you, together with the practical arrangements needed to complete the work.

Include these details with your enquiry.

For any condition affecting safe play, isolate the affected area and have the responsible site team assess it before returning it to use.

  • Order or quotation reference
  • Country, site and court identifier
  • Model and affected component
  • Clear overview and close-up photographs
  • Date noticed and a concise description
  • Relevant installation or maintenance information

THE RIGHT RESPONSE

Tell us what needs attention.

A delivery issue, a replacement request and a product quality concern need different information. We help connect your enquiry to the relevant record and technical team.

Installation guidance
Product quality concern
Send the component information and photographs for warranty assessment and technical review.
Damage noticed at delivery
Keep the packaging and labels, record the delivery condition and contact us with the packing-list reference.
Wear or routine maintenance
Ask for the relevant care guidance and a matching replacement-part proposal where needed.
Installation or later site changes
Share the current layout, connection details and change history so the technical team can review the affected interfaces.

REPLACEMENT PARTS

The right part for the court you own.

Explore padel court components
Transparent PC plate and bolted connection at the edge of a glass panel

Tempered-glass panels

Panel width, height, thickness, hole positions, edge details and the original drawing reference.

Coated framed mesh panels stacked for assembly

Mesh and frame parts

Panel or member identification, section size, fixing positions and the installed finish.

Exterior and interior beam-to-column connections shown side by side

Fixings and accessories

Bracket, bolt, washer, net-post or protective-part details, with photographs of the connection.

Planning a new venue? Include your preferred spare-parts list with the initial order, especially where several courts share the same glass, net or fitting configuration.

Plan equipment & spare parts

KEEP THE VENUE READY

Practical care for daily play.

Keep the supplied care information, installation records and component list together. Use a maintenance routine that reflects the court’s use and surroundings.

Upgrade turf: original blue sample profile.
Artificial turf samples · coordinate surface colour and the selected material specification.
01

Steel frame and mesh

Keep surfaces clean and inspect the finish, joints and connections. Address visible damage using the care instructions for the supplied finish.

02

Tempered glass and fittings

Use suitable cleaning products and equipment. Inspect edges, visible damage, supporting fittings and contact pads; refer structural concerns to the responsible installer.

03

Artificial turf

Remove debris, maintain the specified infill and brush according to the turf guidance. Keep drainage routes clear and record areas showing unusual wear.

04

Net and protective padding

Check net tension, attachment points, cover position and closures. Replace damaged mesh or padding and keep entrances and playing clearances unobstructed.

05

Lighting and roof equipment

Keep luminaires and drainage clear. Follow the supplied electrical and roof operating guidance, using qualified personnel for electrical or moving-roof work.

AFTER-SALES QUESTIONS

Know where to start.

Which installation records help identify replacement parts?

Keep the step-by-step assembly information, numbered component drawings, glass-fitting and lamp-bracket details, and turf layout with the court records. The component number, its installed position and a clear photograph help our factory match your enquiry to the right part.

What is the PadelSpan warranty period?

PadelSpan provides a five-year product quality warranty. Contact our team with the order reference, affected component and photographs so the issue can be reviewed against the supplied equipment and the order records.

How do I report a product quality issue?

Contact Vicky Zhang with the project location, order reference, court model and a description of the issue. Add clear overview and close-up photographs, component labels and relevant measurements. Video is helpful when the issue concerns operation or movement.

What should we do if damage is visible when the shipment arrives?

Record the condition before removing the relevant packaging. Photograph the package, identification labels and affected component, then keep those records with the packing list and delivery information. Contact us so the shipment and component can be traced.

Can we order replacement glass or fittings?

Yes. We identify replacement parts using the court model, order record and component drawing. For glass, include the complete dimensions, thickness, hole pattern and edge details. For fittings, add photographs and the connection position.

Do you support our local installation team?

Yes. PadelSpan provides assembly information, component identification and remote technical support. Your local team coordinates foundations, lifting, electrical works and the site installation, while we help resolve questions about the supplied equipment.

Should we keep a spare-parts list for a multi-court venue?

A model-specific parts list makes maintenance and future orders easier. We can discuss the glass, mesh, net, fittings, padding and lighting parts used across your courts and identify the drawings needed to order matching components.

How often should the court be maintained?

Use the care instructions supplied for the actual components and adapt the inspection routine to play frequency, weather exposure and venue conditions. Assign a responsible person and keep a simple record of inspections, cleaning and any repairs.

Who is our contact after delivery?

Vicky Zhang, Senior Project Manager, is your direct contact at PadelSpan. She coordinates the service enquiry with the relevant factory and technical team and keeps the order and component information connected.

Vicky Zhang, Senior Project Manager at PadelSpan

YOUR FACTORY CONTACT

Vicky Zhang

Senior Project Manager

Meet Vicky

Keep your order reference close. We will take it from there.

Send the component details and photographs to begin a support conversation with the PadelSpan team.

Request a QuoteWhatsApp