Padel courts
WPT Tournament Padel Court
WPT-style tournament padel courts for indoor, outdoor and covered venues. Choose classic exposed corner posts or a panoramic hidden-corner design, with a complete factory-made equipment package.
- Internal playing area
- 20 × 10 m
- Tempered glass
- 12 mm tempered glass
- Corner structure options
- Classic exposed posts / Panoramic hidden-corner connections
Select a view. Open the main image for a closer look.
SPECIFICATIONS YOU CAN COMPARE
Choose a complete equipment configuration.
Compare the frame, glazing, surface and lights as one package. Select the court model and corner arrangement alongside the equipment schedule.
Scroll the table sideways on smaller screens.
| Component | Steel-beam package · 8 × 200 W | Aluminium upper-beam package · 4 × 400 W |
|---|---|---|
| Steelwork & finish | Q235 steel; hot-dip galvanized; black polyester powder coating | Q235 steel frame with an aluminium upper beam; black powder-coated finish |
| Tempered glass | 18 × 3,000 × 1,996 × 12 mm | 18 × 3,000 × 1,996 × 12 mm |
| Supplied turf | PE · 12 mm · 9000D · 58,500 / m² · 210 m² | PE · 12 mm · 9000D · 52,500 / m² · 210 m² |
| Lighting equipment | 8 × 200 W LED · IP66 | 4 × 400 W LED · IP66 |
| Bolts, nuts & screws | 304 stainless steel | 304 stainless steel |
View component dimensions & warranty
| Component | Steel-beam package · 8 × 200 W | Aluminium upper-beam package · 4 × 400 W |
|---|---|---|
| Upper beam | 100 × 50 × 3 mm | 200 × 40 × 3 mm · Al |
| Lower beam | 100 × 50 × 3 mm | 180 × 50 × 10 mm |
| Mesh panel / frame / mesh | 1,000 × 2,000 mm · 50 × 30 × 2 mm / 50 × 50 × 4 mm | 2,000 × 3,000 mm · 50 × 30 × 2 mm / 50 × 50 × 4 mm |
| Light columns / light poles | 100 × 50 × 3 mm / 60 × 60 × 3 mm; 3 m members | 100 × 50 × 3 mm / 60 × 60 × 3 mm; 3 m members |
| PP net supply dimensions | 9,970 × 920 mm · PP · Ø 4 mm · 45 × 45 mm | 9,970 × 920 mm · PP · Ø 4 mm · 45 × 45 mm |
| Joining tape | White nonwoven; 0.3 × 100 m per roll; quantity by quotation | White nonwoven; 0.3 × 100 m per roll; quantity by quotation |
| Component warranty | Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use. | Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use. |
Member lengths and net supply sizes describe components. Assembled light height, net tension and court geometry follow the installation drawings.
The 4 × 400 W package is an additional option. The 8 × 200 W catalogue and 4 × 350 W export options remain available. Select one complete schedule for the quotation.
The two packages retain their declared turf densities. Other CC, Upgrade and Match choices are listed separately; yarn units and the selected turf construction are recorded in the order.
IS THIS THE RIGHT FIT?
Start with the way your venue will be used.
The court at the centre of the venue
Open glass views for padel clubs, featured courts and tournament-style settings.
Choose the corner arrangement
Discuss Classic exposed posts or panoramic concealed-corner connections. Select indoor, outdoor or covered use separately.
Build a complete playing environment
Coordinate the glass supports, upper enclosure, lights and optional entrance and net-post padding.
The project fit
Look beyond the playing lines.
PadelSpan WPT tournament padel courts combine a 20 × 10 m playing area with the structure, glass, turf and lighting selected for your venue. WPT is a familiar tournament-style product designation: indoor, outdoor and covered installations are available. The setting and the corner structure are two separate choices.
For a classic WPT configuration, specify four independent exposed corner posts with 100 × 100 mm square profiles. For an uninterrupted panoramic view, choose the hidden-corner option: L-shaped connections and the supporting steelwork sit behind the glazing, leaving no separate corner post visible from outside. The structure still supports the glass; its visual position changes.
Our factory coordinates the glass connections, enclosure, lamp posts, access and finish in the manufacturing drawings. For filming and spectator viewing, we position the court alongside camera routes, lighting and surrounding circulation. The WPT Tournament model is featured below, alongside the Suspended Super Panoramic alternative.
CHOOSE THE CORNER DESIGN. THEN THE SETTING.
WPT tournament padel courts.
Indoor or outdoor.
Our factory offers Classic and Panoramic corner arrangements for WPT-style padel court projects. Choose how the frame meets the glass, then specify the indoor, outdoor or covered setting independently.

01 WPT Classic
Visible corner posts.
A clearly expressed steel frame with four exposed 100 × 100 mm corner posts. Specify the post section, wall thickness, beam connections and glass fixing details together.
- Four visible corner columns
- Defined steel-to-glass connections
- Custom frame finish, turf and lighting

02 WPT Panoramic
A clear view through the corners.
Concealed L-shaped connections sit behind the glass, without separate visible corner posts. The enclosure remains structurally supported through its engineered connections and surrounding frame.
- Concealed corner connections
- Uninterrupted corner sightlines
- Model-specific glass supports and fixings
TWO CORNER ARRANGEMENTS
Compare the construction, not the venue label.
Both options can be planned for indoor, outdoor or covered sites. The structural drawings identify the selected corner details and their load path.
| What to compare | WPT Classic | WPT Panoramic |
|---|---|---|
| Corner appearance | Four exposed 100 × 100 mm posts | No separate visible corner post |
| Structural connection | Visible columns connect the surrounding frame and glass supports | L-shaped connections behind the glass connect to the supporting structure |
| Viewing experience | Defined frame lines at each corner | Open glass sightlines around each corner |
| Playing area | 20 × 10 m internal doubles layout | 20 × 10 m internal doubles layout |
| Installation setting | Indoor, outdoor or covered | Indoor, outdoor or covered |
| Custom options | RAL finish, turf, lights, branding and safety padding | RAL finish, turf, lights, branding and safety padding |
Prefer a panoramic layout with visible posts? We also quote intermediate panoramic arrangements. Select the corner detail explicitly so your drawings, glass schedule and order describe the same construction.
Additional factory configuration: WPT export package with 4 × 350 W lighting
This equipment option comes from our WPT manufacturing schedule. It is a separate package from the 8 × 200 W catalogue model: select one complete lighting and structural schedule for your order.
| Tempered glass | 12 mm; 1,996 × 3,000 mm; 18 panels |
|---|---|
| Artificial turf | CC: 12 mm; 9000D; 52 500 / m². Upgrade and Match alternatives by selection; 210 m² supply area. |
| Enclosure mesh | Hot-dip galvanized steel; 4 mm wire; 50 × 50 mm openings |
| Upper / lower beams | 155 × 40 mm / 133 × 40 mm galvanized steel profiles |
| Lighting option | 4 × 350 W LED, IP66; four 50 × 100 × 3 mm lamp posts, 3 m member height |
| Net & fittings | 9,970 × 920 mm net; 4 mm PP cord; 45 mm mesh; 304 stainless-steel hardware |
Lamp-post member length and net supply size describe components. The assembled light height, net tension and playing geometry are set out in the installation drawings.
Request this WPT equipment option
ONE COURT CHOICE. THREE ENVIRONMENTS.
The roof does not define the court model.
Indoor padel venues
Coordinate the full playing clearance, lighting, access and enclosure with the building layout.
Outdoor padel venues
Define the local wind exposure, foundations, drainage and protective finish alongside the court frame.
Covered padel venues
Choose a fixed or retractable roof and coordinate supports, clear height, water drainage and maintenance access.
FROM CORNER DETAIL TO PRODUCTION
Put the right WPT option in your quotation.
Send your setting, court count and preferred corner appearance. Our team prepares the model drawings and equipment schedule around your project.
- Classic, Panoramic or a panoramic arrangement with posts
- Country, site exposure and indoor, outdoor or covered use
- Glass support, frame sections, foundations and access layout
- Turf colour, lighting, branding and optional padel court padding
WPT COURTS, EXPLAINED
Clear answers for your project team.
Are WPT padel courts only for indoor use?
No. WPT-style describes the tournament-oriented court offering, rather than whether a roof is present. Classic and Panoramic corner designs can be specified for indoor, outdoor or covered venues. The site and local structural requirements guide the final engineering.
Does Panoramic mean the glass has no structural support?
No. In our Panoramic quotation option, concealed L-shaped connections behind the glass replace a separate visible corner column. The glass, connectors and surrounding frame remain a coordinated structural assembly. Ask for the corner section and fixing drawing when comparing quotations.
What does WPT mean, and does the name certify the court?
WPT refers to the former World Padel Tour. The professional tours were unified under Premier Padel in 2024. PadelSpan uses WPT-style to describe a tournament-oriented configuration, not a standalone certification or approval. Read FIP’s announcement of the unified tour.
What needs reviewing for competition use?
FIP court rules cover more than the 20 × 10 m playing area: clear height, enclosure geometry, the net, playing surface, entrances, safety areas and lighting also matter. We prepare the equipment drawings for review against the venue and event requirements. Read the FIP Rules of Padel.
Do the FIP rules require exposed corner posts?
The court enclosure provisions do not prescribe four exposed corner columns. Classic and concealed-corner structures must still provide the required enclosure geometry, safe surfaces and suitable support. Our corner drawings show how each chosen configuration connects the glass to the supporting structure.
MODEL BY MODEL
Explore the models in this family.
Compare the visible arrangement and its specific equipment schedule.
Product visualizationWPT Tournament Padel Court
WPT Tournament Panoramic Padel Court
WPT tournament-style panoramic design with open glass-corner views
Explore this model
Padel court installation
Product visualizationWPT Tournament Padel Court
Suspended Super Panoramic Padel Court
Suspended enclosure arrangement
Explore this model
Padel court installationCONFIGURATION BY CONFIGURATION
Choose the structure. Define the details.
Each option has its own structure and interfaces. Final dimensions and equipment follow the selected order drawings.
SELECTED CONFIGURATION
WPT Tournament Panoramic Padel Court
Our WPT tournament-style panoramic padel court combines open glass corners, a 20 × 10 m playing area and 12 mm tempered glass. Manufactured for indoor, outdoor or covered venues, with custom frame colours, turf and lighting.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Lighting poles | 60 × 60 × 3 mm; height 3 m |
| Light-pole columns | 100 × 50 × 3 mm; height 3 m |
| Mesh frame | Section defined in the model fabrication drawing |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Factory drawings identify the corner connections, glass fixings, mesh-frame sections and lighting arrangement for this WPT model.

MATERIALS & CONNECTIONS
The details behind the configuration.
Glass connections
A transparent connecting plate links adjacent glass panels. The component reference specifies reinforced PC, 6 mm thick. Match the hole pattern, bolts and supporting structure to the selected glass-fixing schedule.
Match glass and support
Open-view and suspension-style configurations need their own glass-support and fixing schedules. Do not transfer panel or support dimensions from another model.
Framed mesh
Module dimensions, mesh opening, wire diameter and finish belong together in the enclosure schedule. Confirm entrance and door positions on the layout.
Lighting selection
Select 200 W LED fixtures, light-pole shapes and mounting positions for the venue. IP65 and IP66 options are coordinated with the electrical supply and lighting layout.
FACTORY CONFIGURATION OPTIONS
The details that complete your padel court.
Choose the enclosure, playing surface and lighting to match your venue. We bring the selected components together in your manufacturing drawings and equipment schedule.
Mesh enclosure options
- Panel modules
- 1 × 2 m or 1 × 4 m
- Wire diameter reference
- 4 mm
- Mesh opening reference
- 50 × 50 mm
- Mesh-frame reference
- 50 × 30 × 2 mm
Surface options
- Material reference
- PE artificial turf
- Turf pile-height options
- CC: 12 mm; Upgrade: 12 mm; Match: 10 mm
- Density options
- CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
- Gauge reference
- 3/16; unit to be confirmed
- Turf supply allowance
- 210 m² supplied for the 200 m² internal playing area
Lighting and fixing options
- Court lighting reference
- 8 × 200 W LED; final fixture and pole schedule to be agreed
- Fixture protection
- IP65 and IP66 fixture options, selected for the venue
- Pole shapes
- Curved and angular forms; confirm mounting details
- Fastener reference
- SUS304 bolts, nuts and washers in the component schedule
- Glass connection option
- 6 mm transparent PC connecting plate; match to glass and support drawings
YOUR FINISHING SCHEDULE
Give the padel court your club identity.
Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.
The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.
Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

CHOOSE YOUR PLAYING SURFACE
Three turf options for your padel court
Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.
Compare turf specifications and samplesFROM CONFIGURATION TO SETTING
See a related arrangement.
Explore our padel court installations, from outdoor clubs to covered venues.

Outdoor courts Project photograph
Oman: panoramic padel court with lime-green framing.
A panoramic padel court installation in Oman, with lime-green structural framing, glass sightlines and blue turf in a built-up venue.
View projectDefine your equipment
Equipment scope & project choices
Keep the supply scope explicit.
Choose the structural configuration above, then record the selected components, site interfaces and exclusions in one equipment schedule. Review the final drawings with your local project team before construction.
Printable configuration overviewEquipment included
- Selected open-view glass and steel enclosure
- Mesh sections and entrance arrangement
- Artificial turf and court markings
- Centre net frame
- Configuration-specific lighting and connection schedule
Make it fit your project
- Classic exposed 100 × 100 mm corner posts or panoramic hidden-corner design
- Structure and turf colours
- Lighting layout and pole form
- Protective padding and branding
- Spectator-area and canopy interface coordination
A closer look
Configuration & component details
Open an image to inspect it. Product visualizations are identified in the captions.
From specification to site
Prepare for a coordinated delivery.
Installation interfaces
Glass supports and connections must follow the approved configuration. Coordinate the local support and anchorage design, safe handling method and erection sequence before delivery. Spectator routes and any event-specific access requirements should be resolved alongside the court layout.
Installation supportCompare the three installation structuresPacking & arrival
Plan protection and identification for glass, structural members and fittings. Include the destination's lifting access, staging area and installation sequence when discussing packaging. Final packing dimensions and container requirements are order-specific.
Shipping & packagingSupport & warranty terms
PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.
Component warranty: Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.
Five-year warranty & factory supportAfter-sales supportExplore factory-direct padel court supply
Calculate your padel court project budget →
MADE, CHECKED & PACKED IN OUR FACTORY
Know what happens before the equipment reaches your site.
| Stage | What we coordinate | Your project record |
|---|---|---|
| Before manufacture | Model, quantities, finish and component interfaces | Approved drawing and equipment schedule |
| During fabrication | Member dimensions, connections and surface finish | Inspection and material identification |
| Before dispatch | Protected parts, glass packing and fitting kits | Packing list and component labels |
| At installation | Assembly sequence, tools and site interfaces | Installation information and technical support |
| During operation | Maintenance questions and replacement components | Part identification and five-year quality warranty |
YOUR TECHNICAL DOCUMENT PACK
From product selection to a clear equipment schedule.
Download the model specification, review the relevant material records and bring the site information into the drawing discussion.
Download language: English
WPT Tournament Panoramic Padel Court
WPT tournament-style panoramic design with open glass-corner views
Suspended Super Panoramic Padel Court
Suspended enclosure arrangement
Padel equipment delivery checklist
Drawing register, material schedule, packing identification and installation handover checklist.
Practical answers
Questions before you order
Is a WPT padel court only for indoor use?
No. We manufacture WPT-style padel courts for indoor, outdoor and covered venues. Choose the location first, then coordinate the corner structure, foundations, protective finish and lighting for that site.
Which corner design should I request in a WPT quotation?
Specify Classic with four exposed 100 × 100 mm corner posts, or Panoramic hidden corner with connections behind the glazing. A panoramic court can also have visible posts, so include the actual corner detail in your request.
Does no-post panoramic mean there is no structural support?
No-post describes the view at the glass corner. L-shaped connections and supporting members remain behind the glazing; there is no separate exposed corner column in the viewing line.
What does WPT mean when selecting a padel court?
WPT stands for World Padel Tour. PadelSpan uses WPT Tournament to identify its tournament-style range. It describes the product configuration, while the intended event sets its own court and venue requirements.
Can we coordinate the court for filming or streaming?
Yes. Share the camera positions, viewing areas and lighting brief. We coordinate the glass corners, light poles, roof supports and surrounding access to keep the intended viewing lines open.
What information does your factory need?
Send the court count, site location, indoor or outdoor setting, Classic or Panoramic hidden-corner preference, colours, lighting and canopy requirements. We prepare the model drawings, equipment schedule and quotation around those choices.
Continue your selection
Compare another court arrangement

Club & Economy Padel Courts
Club & economy padel courts, manufactured for everyday play.
Explore the product
Panoramic Padel Court
Panoramic padel courts with open views and a defined steel frame.
Explore the product
Portable Padel Court
Portable padel courts with a dedicated movable base.
Explore the productDIRECT FROM OUR FACTORY
Get a quote for your wpt tournament padel court.
Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.
- Model and finish schedule
- Drawings and site interfaces
- Itemized equipment and packing scope
CC turf
Upgrade turf
Match turf