WPT Tournament Padel Court / FACTORY DIRECT

Suspended Super Panoramic Padel Court

An open-view arrangement with suspended upper enclosure details. Review the glass interfaces and upper mesh support as a coordinated assembly.

Configuration focus
Suspended enclosure arrangement
Internal playing area
20 × 10 m / 200 m²
Request this modelDownload model specification PDFAdd a fixed or retractable padel roof

SPECIFICATIONS YOU CAN COMPARE

Choose a complete equipment configuration.

Compare the frame, glazing, surface and lights as one package. Select the court model and corner arrangement alongside the equipment schedule.

Scroll the table sideways on smaller screens.

Two equipment packages, compared on the same basis
ComponentSteel-beam package · 8 × 200 WAluminium upper-beam package · 4 × 400 W
Steelwork & finishQ235 steel; hot-dip galvanized; black polyester powder coatingQ235 steel frame with an aluminium upper beam; black powder-coated finish
Tempered glass18 × 3,000 × 1,996 × 12 mm18 × 3,000 × 1,996 × 12 mm
Supplied turfPE · 12 mm · 9000D · 58,500 / m² · 210 m²PE · 12 mm · 9000D · 52,500 / m² · 210 m²
Lighting equipment8 × 200 W LED · IP664 × 400 W LED · IP66
Bolts, nuts & screws304 stainless steel304 stainless steel
View component dimensions & warranty
Component dimensions for the selected package
ComponentSteel-beam package · 8 × 200 WAluminium upper-beam package · 4 × 400 W
Upper beam100 × 50 × 3 mm200 × 40 × 3 mm · Al
Lower beam100 × 50 × 3 mm180 × 50 × 10 mm
Mesh panel / frame / mesh1,000 × 2,000 mm · 50 × 30 × 2 mm / 50 × 50 × 4 mm2,000 × 3,000 mm · 50 × 30 × 2 mm / 50 × 50 × 4 mm
Light columns / light poles100 × 50 × 3 mm / 60 × 60 × 3 mm; 3 m members100 × 50 × 3 mm / 60 × 60 × 3 mm; 3 m members
PP net supply dimensions9,970 × 920 mm · PP · Ø 4 mm · 45 × 45 mm9,970 × 920 mm · PP · Ø 4 mm · 45 × 45 mm
Joining tapeWhite nonwoven; 0.3 × 100 m per roll; quantity by quotationWhite nonwoven; 0.3 × 100 m per roll; quantity by quotation
Component warrantyFrame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.

Member lengths and net supply sizes describe components. Assembled light height, net tension and court geometry follow the installation drawings.

The 4 × 400 W package is an additional option. The 8 × 200 W catalogue and 4 × 350 W export options remain available. Select one complete schedule for the quotation.

The two packages retain their declared turf densities. Other CC, Upgrade and Match choices are listed separately; yarn units and the selected turf construction are recorded in the order.

IS THIS THE RIGHT FIT?

Start with the way your venue will be used.

01

The court at the centre of the venue

Open glass views for padel clubs, featured courts and tournament-style settings.

02

Choose the corner arrangement

Discuss Classic exposed posts or panoramic concealed-corner connections. Select indoor, outdoor or covered use separately.

03

Build a complete playing environment

Coordinate the glass supports, upper enclosure, lights and optional entrance and net-post padding.

DESIGN & CONFIGURATION

Understand the frame behind the view.

An open-view arrangement with suspended upper enclosure details. Review the glass interfaces and upper mesh support as a coordinated assembly.

Bring the enclosure layout, entrance positions and lighting into the same drawing review. Glass supports, mesh panels and the frame should match the selected model so that fabrication, packing and installation use consistent component references.

Frame section dimensions identify this configuration; the site exposure, anchorage and local foundation design determine the wider project requirements. Share the destination and layout when requesting the equipment proposal.

PRODUCT VISUALIZATIONS

Explore the design from every angle.

Compare the frame layout and colour combinations available for this model.

Colours & custom design

THE COURT IN ITS SETTING

See this padel court on site.

See how this padel court design works in outdoor and covered venues, with custom finishes and lighting.

TECHNICAL SPECIFICATIONS

Specifications for this model.

Keep these values together as a configuration. Final dimensions, quantities and interfaces follow the approved equipment schedule.

Download model PDF
Structure & geometry
Internal playing area20 × 10 m / 200 m²
Posts100 × 50 × 3 mm; height 3 m
Mesh frame50 × 30 × 2 mm
Lighting poles100 × 100 × 3 mm; height 3 m
Surface, glass & equipment
Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

COMPONENTS & MANUFACTURING

Connect the specification to the details.

Full component reference

YOUR FINISHING SCHEDULE

Give the padel court your club identity.

Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.

The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.

Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

Seven padel frame colour references. Logo-free illustration; approve the physical finish sample before production.

CHOOSE YOUR PLAYING SURFACE

Three turf options for your padel court

Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.

CC turf: original brick-red sample photograph.CC turf12 mm · 52 500 / m²
Upgrade turf: original blue sample profile.Upgrade turf12 mm · 63 000 / m²
Match turf: original sample profile; select order colours from the specification table.Match turf10 mm · 46 200 / m²
Compare turf specifications and samples
Orange entrance and net-post protective padding

Optional padel court accessories

Add the protection to your padel court brief.

Protect padel court entrances and net posts with fitted padding. Choose the coverage, colours and your club logo as an optional addition to the padel court package.

FROM DRAWING TO ARRIVAL

Define the package before production.

Connect component identification to the approved drawings and packing list. Agree protection for finished members, fragile glass and smaller fitting kits, with unloading and storage planned at the receiving site.

Include in the model brief

  • Court layout, member schedule and connection drawings
  • Glass sizes, holes, fixing kit and packing sequence
  • Turf product, colour, roll layout, joins and infill scope
  • Lighting model, positions, electrical supply and pole arrangement

FROM CONFIGURATION TO SETTING

See a related arrangement.

Explore our padel court installations, from outdoor clubs to covered venues.

All padel projects

MADE, CHECKED & PACKED IN OUR FACTORY

Know what happens before the equipment reaches your site.

Protected wooden crates secured inside a shipping container

Protective timber crates secured inside a shipping container.

Inside our Hebei factory
Production and delivery records
StageWhat we coordinateYour project record
Before manufactureModel, quantities, finish and component interfacesApproved drawing and equipment schedule
During fabricationMember dimensions, connections and surface finishInspection and material identification
Before dispatchProtected parts, glass packing and fitting kitsPacking list and component labels
At installationAssembly sequence, tools and site interfacesInstallation information and technical support
During operationMaintenance questions and replacement componentsPart identification and five-year quality warranty

YOUR TECHNICAL DOCUMENT PACK

From product selection to a clear equipment schedule.

Download the model specification, review the relevant material records and bring the site information into the drawing discussion.

Download language: English

PLANNING & HANDOVER

Padel equipment delivery checklist

Drawing register, material schedule, packing identification and installation handover checklist.

Download checklist

BEFORE YOU ORDER

Questions about this configuration.

What is suspended in this panoramic arrangement?

The upper enclosure uses a suspended-style support arrangement while the court retains structural support and glass fixings. The model drawing identifies the upper mesh and glass interfaces together.

What is included with this padel court?

The equipment schedule identifies the steel frame, glass, mesh, artificial turf, centre net, lights and fittings for the chosen model. Foundations, drainage, electrical works, freight and installation responsibilities are listed separately in the proposal.

Can I add a roof or branded safety padding?

Yes. Choose a fixed or retractable canopy for a covered venue, and optional entrance or net-post padding with your colours and logo. The roof has its own support and foundation design, coordinated with the padel enclosure.

Which documents and support come with the proposal?

We prepare the selected model specification, layout and equipment schedule, followed by packing and assembly information for the order. Our factory provides installation guidance, spare-part identification and a five-year product quality warranty under the published terms.

MODEL BY MODEL

Compare within this family.

Compare the visible arrangement and its specific equipment schedule.

Compare models

DIRECT FROM OUR FACTORY

Get a quote for your suspended super panoramic padel court.

Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.

  1. Model and finish schedule
  2. Drawings and site interfaces
  3. Itemized equipment and packing scope
Vicky ZhangSenior Project Managervicky@padelspan.comDiscuss this product
Planning the whole investment? Open the cost & ROI calculator →

Request your equipment proposal

Selected model: Suspended Super Panoramic Padel Court

Fields marked * are required.

Contact and project details
Add drawings or a detailed brief →

Your enquiry is emailed to our sales team.

Request a QuoteWhatsApp