COURT SAFETY ACCESSORIES
Padel Court
Safety Padding.
Protect net posts and court entrances with fitted padding, coordinated colours and your club’s branding.

Plan the protection around the player.
Review the contact points in your layout and identify each cover in the equipment schedule. Padding can be quoted with a new court or as a measured upgrade for an existing venue.

Net-post protectors
A fitted cover wraps the exposed net-post body. Confirm the post profile, covered height and access to the tensioning mechanism so protection and net operation are coordinated.

Entrance sides & overhead members
Coordinate the two vertical sides and the upper member as an entrance set. Review joints, closure positions and the clear opening after the padding is installed.
Corner posts, light poles & other locations
Send the dimensions and marked photographs for these custom applications. Their required shape and attachment need a separate review of the post, adjacent glass or mesh, circulation and equipment access.
Define the core. Specify the cover.
The material description is the starting point. The order record should identify the complete fitted assembly.
EVA cushioning core
An EVA cushioning core absorbs contact around padel court posts and entrance members. Core thickness, hardness and covered height are selected for the post shape and intended protection area.
PVDF tarpaulin outer cover
A PVDF tarpaulin outer cover provides a durable surface for outdoor use, with water, tear and UV resistance. We specify the fabric, finish and cleaning instructions for the selected padding.
A fitted protective assembly
The cover needs to follow the post profile and the intended protection area. Review corners, joints, closure positions and the installed projection into the entrance or playing space before confirming the design.
Match the venue. Carry your brand.
Choose the cover colour and discuss logo printing on the net-post and entrance pieces. Explore four product visualizations showing colour and logo placement options.
Prepare the artwork
Provide a vector logo, preferred colour reference and a marked drawing showing print size, orientation and positions. Approve a visual proposal and the selected material sample before production.
Confirm the appearance
Screen colours and generic LOGO labels are illustrative. Confirm fabric availability, printing method and the approved artwork for the actual order; other colours can be discussed.
Explore OEM customizationSpecifications to agree.
Use these fields to turn the selected coverage into an itemized proposal.
| Product role | Separate safety accessory; supply scope agreed with the court or replacement order. |
|---|---|
| Illustrated applications | Net posts, entrance side members and entrance overhead members. |
| Inner filling | EVA; density, hardness and thickness selected for the application. |
| Outer cover | PVDF tarpaulin; fabric specification and care guidance specified with the order. |
| Dimensions & fit | Based on post section or circumference, covered height, entrance geometry and clearances. |
| Attachment & joints | Closure type, fixing details and joint coverage specified with the order in the selected design. |
| Colours & graphics | Colour, style and logo printing are customizable. Approve the sample and artwork position before production. |
| Additional post locations | Corner-post and light-pole covers require their own dimensions and location review. |
Our accessory proposal specifies padding dimensions, core material, cover fabric, fastening, quantities and branding for each installation position.
A separate line in the project scope.
Specify the accessory for the venue’s intended use, operating needs and branding brief.
Clubs & premium venues
Coordinate the entrance and net-post details with court colours, club identity and the equipment schedule. Define the coverage as a separate line in the proposal.
Schools & community projects
Review contact points, circulation, supervision and daily inspection with the operator. Select the padding scope for the actual users and layout.
Existing court upgrades
Use photographs and measured post profiles to prepare a retrofit proposal. Check access to the net tensioner, door movement and the condition of the underlying structure.
Contractors & branded ranges
Record sizes, colours, artwork and quantities by component reference so each court receives the intended parts and replacement enquiries use the same specification.
See the installed details.
Nine installation views show entrance protection, net-post covers and indoor or outdoor settings. Select a photograph to inspect the full image.
Protect entrance frames, net posts and exposed columns with made-to-fit padding in your venue colours.
Fit securely. Keep the details serviceable.
Agree the attachment method and joint coverage for each part. At installation, check that the covers stay in position, protect the intended contact areas and preserve the entrance opening, net operation and required playing clearances.
Include inspection and care instructions with the handover record. Recheck fastening, movement, tears and exposed hard edges during use, and discuss replacement covers when the material or fit deteriorates.
Build your padding brief.
Choose a starting scope. Add the dimensions you know; photographs and artwork can be attached with your enquiry.
Count net-post covers, entrance sets and additional covers separately.
Before you specify.
Clarify the fit, coverage and information needed for a useful quotation.
Is safety padding included with every court?
Padding is listed separately in the equipment scope and is not assumed to be included with every court package. For projects with specific sporting, operator or procurement requirements, define the required protection before the quotation is approved.
Can we order padding for an existing court?
Yes, an existing-court enquiry can start with clear photographs, post dimensions, the desired covered height and quantities by location. Compatibility and attachment details need to be checked against the actual structure.
Which parts of the court can be protected?
Net posts, entrance side members and overhead entrance members can be padded. We also prepare fitted corner-post and light-pole covers using the measured post profiles and the required covered height.
Can we choose the colour and print our logo?
Colour, style and logo printing are available customization options. Provide vector artwork, the preferred colour reference, logo size and marked positions. Screen colours and visualizations are illustrative; confirm the sample and final artwork before production.
What is the padding made from?
The padding combines an EVA cushioning core with a PVDF tarpaulin outer cover. Thickness, fabric, closures and covered height are specified for the selected post or entrance assembly.
How is padding specified for a tender or venue requirement?
Share the required thickness, coverage, attachment details and any requested material evidence. We prepare a fitted padding specification for the court drawings and provide the documentation relevant to the supplied materials.
How do we specify the number of pieces?
Count net-post covers separately from complete entrance sets and any additional covers. Include the number of courts and a marked layout so the quotation can identify every location; there is no assumed universal kit quantity.
What should be checked during use?
Check that covers remain secure, joints stay covered and no closures or fixings create a new projection. Inspect for tears, movement, exposed hard edges and changes to access or net operation. Agree cleaning, inspection and replacement guidance with the supplied design.
Our padel court padding combines EVA filling with PVDF tarpaulin covers. Choose the coverage, colour and printed logo to suit your club or venue.