COLOURS. DETAILS. YOUR BRAND.
OEM & ODM Padel Court Customization
Coordinate turf, steel finishes, lighting and branded details around your venue.
Explore customization options
Start with your colours.
Coordinate the playing surface and steel finish. Select preferences to include in your enquiry.
Artificial turf
Discuss colour alongside pile height, fibre specification, density and the installation method.
Compare turf specifications and samplesPadel frame finish
The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.
Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.
Screen colours are illustrative. Each turf option displays its original sample photograph. Confirm the selected turf colour and frame finish with physical samples before production.
Choose the light-pole profile.
Choose from three light-pole styles, with fixtures and mounting details coordinated around your padel court.
Make the details your own.
Select the ideas you would like to discuss. Each option is reviewed against your court and site requirements.
Corner-post detailing
Discuss the decorative face, finish and artwork position. Structural connections follow the selected court drawings.
Provide: a marked-up sketch and preferred finish.
Illuminated branding
Explore an illuminated letter or logo panel with your own artwork. Agree its location, power supply and weather protection.
Provide: vector artwork, dimensions and mounting position.
Overhead ball containment
Discuss top netting where surrounding spaces need ball containment. Review clear height, supports and playing requirements before selection.
Provide: site layout, available height and adjacent uses.
Safety padding & logo printing
Coordinate net-post and entrance protectors with your venue identity. Discuss the cover colour, fitted dimensions and artwork positions; corner and light-pole locations need a separate fit review.
Provide: post dimensions, coverage height, quantities by position, colour reference and vector artwork.
Explore padding materials, coverage & sizingYour customization brief
Choose colours, a pole style or a detail above. You can also start with an open brief.
Your preferences will appear in the editable enquiry context. Attach artwork or drawings on the next page.
FROM PREFERENCE TO SPECIFICATION
A clear design process.
Develop a coordinated brief for a single venue or a repeatable OEM range. Start with the material and component specifications, then review how your chosen finish connects to the fabrication and coating process.
Define the scope
Choose a court family and identify colours, branding and equipment options. Flag changes to supports, entrances or overall geometry for technical review.
Set the visual direction
Provide vector artwork, logo dimensions, positions and colour references. Agree the material samples and finish before confirming production.
Coordinate the design
Review the proposal, component schedule and drawing revisions with your project team. Resolve structural, foundation and electrical interfaces for the actual site.
Confirm the order record
Keep the approved drawings, artwork, finishes and packing requirements together. Use the same configuration reference for repeat orders and spare parts.
What to include in your brief
- Court family, quantity and destination
- Site plan, available space and project stage
- Colour references and preferred material samples
- Artwork, logo placement and special requests
Carry the design through to delivery.
Connect the approved configuration to its packing list and installation documents.
Packaging & identification
Agree surface protection, glass packing, component labels and order references. Record any branding required on the packaging.
Packaging detailsInstallation coordination
Request model-specific drawings, numbered components and the assembly sequence. Coordinate foundations and electrical work with your local installer.
Installation supportBefore you customize.
Agree the materials, artwork and technical scope together.
What should I provide for a logo application?
Provide the original artwork, desired dimensions, placement and colour references. The proposed application method and final scope should be agreed before production.
Can a reference photograph be copied exactly?
A photograph can communicate a preference, but technical details, brand rights and manufacturing requirements must be assessed separately. Use it as an input to a defined proposal rather than an automatic specification.
Does every customized order need a new structure?
No. Many requests concern colours, branding or documented configuration choices. Structural development is considered separately when the requested change affects the underlying configuration.
Choose frame finishes, turf, lighting, padding and branding with our factory team. We prepare the drawings and finish schedule for your custom padel court.