Padel courts

Portable Padel Court

Portable padel courts with a dedicated movable base.

Internal playing area
20 × 10 m
Configuration arrangement
Padel court with a dedicated movable base platform
Tempered glass
12 mm tempered glass

IS THIS THE RIGHT FIT?

Start with the way your venue will be used.

01

Temporary and changing venues

A padel enclosure with a dedicated base platform for venues planning assembly and later relocation.

02

Plan the receiving surface

Allow for levels, drainage, access and the designed support arrangement before ordering the platform.

03

Keep the components identified

A clear packing and assembly record supports dismantling, storage and repeat installation.

The project fit

Look beyond the playing lines.

PadelSpan portable padel courts combine a complete padel enclosure with a dedicated base platform for temporary venues, events and planned relocations. A 20 × 10 m internal playing area is supplied with glass, mesh, turf, centre net and lighting in a coordinated package.

The base layout, support points, platform connections and entrance transitions are developed around the proposed surface and operating plan. Frame and turf colours, light-pole choices and protective accessories let the court match a club, exhibition or event identity.

Our project team coordinates delivery access, assembly order and future dismantling with your local crew. The site review covers surface capacity, levels, drainage, anchorage or support requirements, and handling space. Components are identified for assembly, repacking and replacement support.

MODEL BY MODEL

Explore the models in this family.

Compare the visible arrangement and its specific equipment schedule.

Compare models

CONFIGURATION BY CONFIGURATION

Choose the structure. Define the details.

Compare families

Each option has its own structure and interfaces. Final dimensions and equipment follow the selected order drawings.

SELECTED CONFIGURATION

Portable Platform Padel Court

A court enclosure supplied around a dedicated platform arrangement. Plan the receiving surface, access, levelling and handling together with the enclosure.

Structure & geometry
Internal playing area20 × 10 m / 200 m²
Configuration compositionPadel court + dedicated relocatable base platform
Steel member scheduleDefined by the selected platform and enclosure drawings
Surface, glass & equipment
Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

Portable Platform Court · product and colour visualizations
Product visualization. Portable Platform Court · product and colour visualizations

MATERIALS & CONNECTIONS

The details behind the configuration.

All components

Base and enclosure interfaces

Identify the model-specific base, support and fixing arrangement. General fitting photographs do not establish ballast or anchorage requirements.

Identify before reassembly

Keep identification labels and packing records with the court. Agree a lifting and reassembly plan before relocating equipment.

Glass connections

A transparent connecting plate links adjacent glass panels. The component reference specifies reinforced PC, 6 mm thick. Match the hole pattern, bolts and supporting structure to the selected glass-fixing schedule.

Lighting selection

Select 200 W LED fixtures, light-pole shapes and mounting positions for the venue. IP65 and IP66 options are coordinated with the electrical supply and lighting layout.

FACTORY CONFIGURATION OPTIONS

The details that complete your padel court.

Choose the enclosure, playing surface and lighting to match your venue. We bring the selected components together in your manufacturing drawings and equipment schedule.

Mesh enclosure options

Panel modules
1 × 2 m or 1 × 4 m
Wire diameter reference
4 mm
Mesh opening reference
50 × 50 mm
Mesh-frame reference
50 × 30 × 2 mm

Surface options

Material reference
PE artificial turf
Turf pile-height options
CC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Density options
CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Gauge reference
3/16; unit to be confirmed
Turf supply allowance
210 m² supplied for the 200 m² internal playing area

Lighting and fixing options

Court lighting reference
8 × 200 W LED; final fixture and pole schedule to be agreed
Fixture protection
IP65 and IP66 fixture options, selected for the venue
Pole shapes
Curved and angular forms; confirm mounting details
Fastener reference
SUS304 bolts, nuts and washers in the component schedule
Glass connection option
6 mm transparent PC connecting plate; match to glass and support drawings

YOUR FINISHING SCHEDULE

Give the padel court your club identity.

Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.

The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.

Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

Seven padel frame colour references. Logo-free illustration; approve the physical finish sample before production.

CHOOSE YOUR PLAYING SURFACE

Three turf options for your padel court

Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.

CC turf: original brick-red sample photograph.CC turf12 mm · 52 500 / m²
Upgrade turf: original blue sample profile.Upgrade turf12 mm · 63 000 / m²
Match turf: original sample profile; select order colours from the specification table.Match turf10 mm · 46 200 / m²
Compare turf specifications and samples

Define your equipment

Equipment scope & project choices

Compare court families

Keep the supply scope explicit.

Choose the structural configuration above, then record the selected components, site interfaces and exclusions in one equipment schedule. Review the final drawings with your local project team before construction.

Printable configuration overview

Equipment included

  • Selected court enclosure
  • Dedicated base-platform arrangement
  • Glass, mesh and entrance components
  • Turf and centre net frame
  • Lighting and component schedule agreed for the installation

Make it fit your project

  • Structure and turf colours
  • Lighting arrangement
  • Protective padding and venue branding
  • Packaging and component identification for relocation
  • Spare-parts planning
Explore customizationSpecify entrance & net-post safety padding

From specification to site

Prepare for a coordinated delivery.

Installation interfaces

Confirm surface condition, level, support requirements, access and the platform's complete external footprint with the venue team. Agree any anchorage or ballast provisions through the project design. Plan assembly, inspection and removal as separate activities with suitable personnel and handling equipment.

Installation supportCompare the three installation structures

Packing & arrival

Provide the delivery route, loading restrictions and available storage area. For a relocating venue, discuss how components will be protected, identified, checked and repacked after use. Reusable packaging and replacement materials should be considered explicitly in the scope.

Shipping & packaging

Support & warranty terms

PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.

Component warranty: Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.

Five-year warranty & factory supportAfter-sales support

Explore factory-direct padel court supply

Calculate your padel court project budget →

MADE, CHECKED & PACKED IN OUR FACTORY

Know what happens before the equipment reaches your site.

Protected wooden crates secured inside a shipping container

Protective timber crates secured inside a shipping container.

Inside our Hebei factory
Production and delivery records
StageWhat we coordinateYour project record
Before manufactureModel, quantities, finish and component interfacesApproved drawing and equipment schedule
During fabricationMember dimensions, connections and surface finishInspection and material identification
Before dispatchProtected parts, glass packing and fitting kitsPacking list and component labels
At installationAssembly sequence, tools and site interfacesInstallation information and technical support
During operationMaintenance questions and replacement componentsPart identification and five-year quality warranty

YOUR TECHNICAL DOCUMENT PACK

From product selection to a clear equipment schedule.

Download the model specification, review the relevant material records and bring the site information into the drawing discussion.

Download language: English

PLANNING & HANDOVER

Padel equipment delivery checklist

Drawing register, material schedule, packing identification and installation handover checklist.

Download checklist

Practical answers

Questions before you order

Can a portable court be installed on any flat surface?

No. Surface condition, support, level, drainage and the complete base design need to be assessed together. Send available construction information and photographs so the next review can focus on the actual venue.

Does portable mean no anchors or ballast?

It describes the intended configuration arrangement, not a universal support method. Anchorage, ballast or other provisions depend on the selected design and site conditions. Confirm them before making commitments to a venue owner.

Can the same court be moved frequently?

Explain the expected relocation pattern at the enquiry stage. Repeated glass handling, dismantling and reassembly create specific planning and inspection needs. Do not assume a relocatable product is intended for unrestricted frequent movement.

How much extra space does the base need?

Request the selected platform's external dimensions and any projections, ramps or working space. The 20 × 10 m playing rectangle is not the transport platform footprint or the total event area.

What equipment is needed for removal?

The method depends on the final component sizes and site access. The venue team should plan appropriate lifting and glass-handling equipment, protected staging and packing, using the approved dismantling sequence.

What information helps produce a useful temporary-venue proposal?

Provide the location, intended operating dates, surface information, access restrictions, court count and relocation expectations. Add the venue plan and identify who will handle local permissions, installation and removal.

DIRECT FROM OUR FACTORY

Get a quote for your portable padel court.

Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.

  1. Model and finish schedule
  2. Drawings and site interfaces
  3. Itemized equipment and packing scope
Vicky ZhangSenior Project Managervicky@padelspan.comDiscuss this product
Planning the whole investment? Open the cost & ROI calculator →

Request your equipment proposal

Fields marked * are required.

Contact and project details
Add drawings or a detailed brief →

Your enquiry is emailed to our sales team.

Request a QuoteWhatsApp