Portable Padel Court / FACTORY DIRECT

Portable Platform Padel Court

A court enclosure supplied around a dedicated platform arrangement. Plan the receiving surface, access, levelling and handling together with the enclosure.

Configuration focus
Court + dedicated relocatable platform
Internal playing area
20 × 10 m / 200 m²
Request this modelDownload model specification PDFAdd a fixed or retractable padel roof

IS THIS THE RIGHT FIT?

Start with the way your venue will be used.

01

Temporary and changing venues

A padel enclosure with a dedicated base platform for venues planning assembly and later relocation.

02

Plan the receiving surface

Allow for levels, drainage, access and the designed support arrangement before ordering the platform.

03

Keep the components identified

A clear packing and assembly record supports dismantling, storage and repeat installation.

DESIGN & CONFIGURATION

Understand the frame behind the view.

A court enclosure supplied around a dedicated platform arrangement. Plan the receiving surface, access, levelling and handling together with the enclosure.

Bring the enclosure layout, entrance positions and lighting into the same drawing review. Glass supports, mesh panels and the frame should match the selected model so that fabrication, packing and installation use consistent component references.

Frame section dimensions identify this configuration; the site exposure, anchorage and local foundation design determine the wider project requirements. Share the destination and layout when requesting the equipment proposal.

PRODUCT VISUALIZATIONS

Explore the design from every angle.

Compare the frame layout and colour combinations available for this model.

Colours & custom design

THE COURT IN ITS SETTING

See this padel court on site.

See how this padel court design works in outdoor and covered venues, with custom finishes and lighting.

TECHNICAL SPECIFICATIONS

Specifications for this model.

Keep these values together as a configuration. Final dimensions, quantities and interfaces follow the approved equipment schedule.

Download model PDF
Structure & geometry
Internal playing area20 × 10 m / 200 m²
Configuration compositionPadel court + dedicated relocatable base platform
Steel member scheduleDefined by the selected platform and enclosure drawings
Surface, glass & equipment
Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

COMPONENTS & MANUFACTURING

Connect the specification to the details.

Full component reference

YOUR FINISHING SCHEDULE

Give the padel court your club identity.

Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.

The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.

Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

Seven padel frame colour references. Logo-free illustration; approve the physical finish sample before production.

CHOOSE YOUR PLAYING SURFACE

Three turf options for your padel court

Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.

CC turf: original brick-red sample photograph.CC turf12 mm · 52 500 / m²
Upgrade turf: original blue sample profile.Upgrade turf12 mm · 63 000 / m²
Match turf: original sample profile; select order colours from the specification table.Match turf10 mm · 46 200 / m²
Compare turf specifications and samples
Orange entrance and net-post protective padding

Optional padel court accessories

Add the protection to your padel court brief.

Protect padel court entrances and net posts with fitted padding. Choose the coverage, colours and your club logo as an optional addition to the padel court package.

FROM DRAWING TO ARRIVAL

Define the package before production.

Connect component identification to the approved drawings and packing list. Agree protection for finished members, fragile glass and smaller fitting kits, with unloading and storage planned at the receiving site.

Include in the model brief

  • Court layout, member schedule and connection drawings
  • Glass sizes, holes, fixing kit and packing sequence
  • Turf product, colour, roll layout, joins and infill scope
  • Lighting model, positions, electrical supply and pole arrangement

MADE, CHECKED & PACKED IN OUR FACTORY

Know what happens before the equipment reaches your site.

Protected wooden crates secured inside a shipping container

Protective timber crates secured inside a shipping container.

Inside our Hebei factory
Production and delivery records
StageWhat we coordinateYour project record
Before manufactureModel, quantities, finish and component interfacesApproved drawing and equipment schedule
During fabricationMember dimensions, connections and surface finishInspection and material identification
Before dispatchProtected parts, glass packing and fitting kitsPacking list and component labels
At installationAssembly sequence, tools and site interfacesInstallation information and technical support
During operationMaintenance questions and replacement componentsPart identification and five-year quality warranty

YOUR TECHNICAL DOCUMENT PACK

From product selection to a clear equipment schedule.

Download the model specification, review the relevant material records and bring the site information into the drawing discussion.

Download language: English

PLANNING & HANDOVER

Padel equipment delivery checklist

Drawing register, material schedule, packing identification and installation handover checklist.

Download checklist

BEFORE YOU ORDER

Questions about this configuration.

Can this padel court be relocated?

The dedicated platform is designed around a relocatable court arrangement. Plan dismantling, glass handling, lifting, transport and reassembly with the selected base and site conditions. Keep component labels and assembly records for the next installation.

What is included with this padel court?

The equipment schedule identifies the steel frame, glass, mesh, artificial turf, centre net, lights and fittings for the chosen model. Foundations, drainage, electrical works, freight and installation responsibilities are listed separately in the proposal.

Can I add a roof or branded safety padding?

Yes. Choose a fixed or retractable canopy for a covered venue, and optional entrance or net-post padding with your colours and logo. The roof has its own support and foundation design, coordinated with the padel enclosure.

Which documents and support come with the proposal?

We prepare the selected model specification, layout and equipment schedule, followed by packing and assembly information for the order. Our factory provides installation guidance, spare-part identification and a five-year product quality warranty under the published terms.

DIRECT FROM OUR FACTORY

Get a quote for your portable platform padel court.

Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.

  1. Model and finish schedule
  2. Drawings and site interfaces
  3. Itemized equipment and packing scope
Vicky ZhangSenior Project Managervicky@padelspan.comDiscuss this product
Planning the whole investment? Open the cost & ROI calculator →

Request your equipment proposal

Selected model: Portable Platform Padel Court

Fields marked * are required.

Contact and project details
Add drawings or a detailed brief →

Your enquiry is emailed to our sales team.

Request a QuoteWhatsApp