PRACTICAL ANSWERS

Padel court questions before you build.

Find the basics of court selection and the responsibilities that turn an equipment order into a workable project. Final specifications and commercial terms belong in your agreed order documents.

Court & canopy questions

How much space should I allow for a doubles padel court?

The reference internal playing rectangle is 20 × 10 m. The full site needs additional space for the enclosure, supports, entrances, circulation and maintenance. A canopy or portable base adds its own footprint. Ask for the selected layout and confirm clear height before deciding that a site is suitable.

How do Club, Panoramic and WPT Tournament padel courts differ?

All use the same 20 × 10 m doubles playing area. Club courts use a framed enclosure; Panoramic courts focus on glass sightlines; our WPT Tournament range adds a focused choice of Classic exposed corner posts or panoramic hidden-corner connections for indoor, outdoor and covered venues.

Should I choose a fixed or retractable canopy?

Compare the desired covered space, support locations, drainage and usable playing clearance. A retractable roof also needs an agreed power supply, control arrangement, operating limits and maintenance plan. Review local design requirements and the complete site layout before choosing the equipment.

Can the turf, lighting and court colours be customized?

Colour, surface, lighting and branding choices can be discussed for the selected family. Record the actual turf specification, fixtures, finish and approved branding positions in the quotation. A requested change to structural members, glass supports or connections needs a technical review beyond a colour selection.

Does a portable court avoid all foundation and support requirements?

No. A portable arrangement still requires a review of the surface, levels, drainage and complete base. Any anchorage or ballast must follow the selected project design. Also plan transport, safe glass handling, assembly, inspection and removal, especially if relocation will be repeated.

Do the available certificates cover my entire project?

The original glass report and panoramic-court attestation each identify a particular holder and scope. They do not establish that every configuration or installation is approved. Match the relevant documentation to the ordered equipment and ask the local project team which additional design checks or approvals are required.

Supply & service questions

What information is needed for a useful quotation?

Start with the country and city, court count, preferred family, indoor or outdoor use, canopy preference and target timeline. Add a site sketch or measured plan if available. Ask for equipment, packing, freight, local works and installation responsibilities to be listed clearly so quotations can be compared on the same basis.

Who is responsible for foundations and installation?

Agree the scope before ordering. The selected equipment information needs to be coordinated with local foundation, drainage and electrical design. The quotation should identify who provides unloading, lifting equipment, assembly, site supervision and final inspections. Installation support does not automatically include every local activity.

How are production, shipping and delivery dates confirmed?

Dates depend on the approved configuration, order quantity, drawing approvals, destination and transport arrangements. Confirm the schedule and delivery terms in the quotation. Plan customs requirements, site access, unloading and protected storage separately; there is no single delivery time or container capacity for every order.

What should an OEM or distributor brief include?

Describe the target court family, forecast order requirements, colours, branding, market documentation and packaging preferences. Define which configuration choices can change and which must stay consistent. Confirm the information that installers and customers will receive, plus how spare parts and after-sales questions will be handled.

What warranty and spare-parts support does CourtSpan provide?

CourtSpan provides a five-year product quality warranty, installation guidance and spare-parts support. Send the order reference, part location, dimensions and clear photographs to our after-sales team. We use the manufacturing drawings and component schedule to identify the part and review the issue.

Can I attach drawings, and does the preview form send an enquiry?

The form accepts up to three PDF, JPG, PNG, DWG or DXF files, up to 10 MB each and 20 MB combined. It requires your name, a valid email address, project country and processing consent. In this local preview, a successful submission saves the details and attachments locally; no email, CRM entry or WhatsApp message is sent. You can contact Vicky directly using the separate phone or WhatsApp link.

YOUR NEXT STEP

Discuss the questions specific to your site.

Share your location, court count and what you have in mind. Vicky will help shape the equipment brief.

Request a QuoteWhatsApp