Padel court canopies
Retractable Padel Court Canopy
Retractable padel court canopies for open or covered play.
- Freestanding dimensions
- 22 × 12 × 8.8 m overall (L × W × H)
- Integrated dimensions
- 20.6 × 10.6 × 8.8 m overall (L × W × H)
- Roof function
- Motorized opening and closing
Select a view. Open the main image for a closer look.
IS THIS THE RIGHT FIT?
Start with the way your venue will be used.
Open-air and covered use
A motorized roof lets the venue choose between an open or covered padel setting.
Compact or independent
Integrated and freestanding layouts use different footprints and support sections.
Design for daily operation
Specify the controls, power supply, moving zones, access and operating instructions with the roof package.
The project fit
Plan the cover with the court.
PadelSpan manufactures motorized retractable padel court canopies that give venues a choice of open and covered roof positions. The roof package combines moving sections, structural supports, membrane and controls with the selected padel court layout.
Integrated and freestanding configurations offer two footprints. We coordinate the moving zones, support positions, electrical supply, lighting and maintenance access during the design stage. Controls and operating arrangements are specified to match the venue and its local electrical requirements.
The manufacturing and delivery package includes identified components, assembly information and the selected operating instructions. We work with your local team on foundations, connections, electrical interfaces and handover, including the weather operating limits and inspection routine for the chosen roof.
MODEL BY MODEL
Explore the models in this family.
Compare the visible arrangement and its specific equipment schedule.
Product visualizationRetractable Padel Court Canopy
Integrated Retractable Padel Canopy
Compact motorized roof configuration
Explore this model
Roof installation
Product visualizationRetractable Padel Court Canopy
Freestanding Retractable Padel Canopy
Independent motorized roof configuration
Explore this model
Roof installationCONFIGURATION BY CONFIGURATION
Choose the structure. Define the details.
Each option has its own structure and interfaces. Final dimensions and equipment follow the selected order drawings.
SELECTED CONFIGURATION
Integrated Retractable Padel Canopy
A motorized opening-roof arrangement with a compact footprint. Coordinate the moving roof, electrical provision, controls and maintenance access from the design stage.
| Overall dimensions L × W × H | 20.6 × 10.6 × 8.8 m |
|---|---|
| Column section | 100 × 100 × 3 mm |
| Column height | 6 m |
| Arch rise | 2.8 m |
| Operation | Motorized opening / closing with controls selected for the venue |
| Covering | PVDF membrane with material-specific technical documentation |
|---|---|
| Playing clearance | Playing clearance measured below the lowest roof member, light or service |
| Site design | Project-specific support foundations, loading and drainage |
Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

MATERIALS & CONNECTIONS
The details behind the configuration.
Membrane and fabric
Choose the membrane grade, coating and fabric construction for the roof. Request the applicable material reports and warranty details with the canopy specification.
Lighting selection
Select 200 W LED fixtures, light-pole shapes and mounting positions for the venue. IP65 and IP66 options are coordinated with the electrical supply and lighting layout.
Keep moving-roof parts identifiable
The drive, moving roof sections and controls require model-specific identification and handover records.
Sequence court and canopy works
Coordinate court assembly, canopy installation, lifting access and electrical works in the site construction schedule.
FACTORY CONFIGURATION OPTIONS
A complete roof package, built around your padel court.
Bring the roof structure, membrane, lighting and drainage together in one coordinated design. Our factory prepares the equipment package around your site and chosen roof model.
Roof coordination
- Clear playing height
- Clear playing height coordinated below the lowest roof member, light or service
- LED lighting
- 8 × 200 W LED, 6500 K; 180–220 V / 50 Hz. Electrical selection adapted to the destination.
- Lighting design
- Lighting layout coordinated for playing visibility, uniformity and mounting height
- Canopy membrane
- 750 g/m² PVDF membrane option with supporting material reports
- Water and site interfaces
- Coordinated gutters, downpipes, drainage, foundations and maintenance access
CONFIGURE YOUR PROJECT
Select the membrane and lighting around the roof.
The roof configuration, membrane, lighting and controls need to describe one coordinated package.

Membrane specification
Select the fabric, coating and weight with the relevant material report. PadelSpan provides a five-year product quality warranty and factory support.

Roof and lighting interfaces
Coordinate the selected fixtures, pole or roof mounts, power supply and maintenance access.
Define your equipment
Equipment scope & project choices
Keep the supply scope explicit.
Choose the structural configuration above, then record the selected components, site interfaces and exclusions in one equipment schedule. Review the final drawings with your local project team before construction.
Printable configuration overviewEquipment included
- Selected motorized canopy arrangement
- Moving covering and structural support structure
- Control and electrical component schedule defined in the quotation
- Installation and operating information for the selected configuration
Make it fit your project
- Independent split or integrated layout
- Structure and covering colours
- Control arrangement and agreed accessories
- Coordination with lighting and venue services
- Maintenance-access and spare-parts planning
A closer look
Configuration & component details
Open an image to inspect it. Product visualizations are identified in the captions.
From specification to site
Prepare for a coordinated delivery.
Installation interfaces
Coordinate structural supports, foundations, power supply, isolation, controls and access for servicing. A competent local team should complete the site-specific electrical work and applicable inspections. The handover should cover the agreed operating limits and the procedure for taking the configuration out of service.
Installation supportPacking & arrival
The packing and arrival plan must account for structural members, covering and electrical or control components. Keep sensitive components protected and identifiable. Confirm the order-specific packing schedule and available unloading equipment before dispatch.
Shipping & packagingSupport & warranty terms
PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.
Five-year warranty & factory supportAfter-sales supportExplore factory-direct padel court supply
Calculate your padel court project budget →
MADE, CHECKED & PACKED IN OUR FACTORY
Know what happens before the equipment reaches your site.
| Stage | What we coordinate | Your project record |
|---|---|---|
| Before manufacture | Model, quantities, finish and component interfaces | Approved drawing and equipment schedule |
| During fabrication | Member dimensions, connections and surface finish | Inspection and material identification |
| Before dispatch | Protected parts, glass packing and fitting kits | Packing list and component labels |
| At installation | Assembly sequence, tools and site interfaces | Installation information and technical support |
| During operation | Maintenance questions and replacement components | Part identification and five-year quality warranty |
YOUR TECHNICAL DOCUMENT PACK
From product selection to a clear equipment schedule.
Download the model specification, review the relevant material records and bring the site information into the drawing discussion.
Download language: English
Integrated Retractable Padel Canopy
Compact motorized roof configuration
Freestanding Retractable Padel Canopy
Independent motorized roof configuration
Padel equipment delivery checklist
Drawing register, material schedule, packing identification and installation handover checklist.
Practical answers
Questions before you order
Will the roof close automatically when it rains?
Weather sensors and automatic operating functions are specified with the selected controls. Include your preferred rain-response and operating routine so we can prepare the appropriate control package.
Can the roof be operated in strong wind or under snow?
We define the operating conditions for the selected roof using the site weather requirements and project documentation. The handover explains wind and snow restrictions, inspection and the correct parking position.
What electrical information is needed?
Provide the local supply characteristics and identify the electrical contractor responsible for site wiring, protection and isolation. The final proposal should state the equipment requirements and where the local installation connects to it.
How do I compare split and integrated layouts?
Compare support locations, overall footprint, usable clearance and access for maintenance. Also consider how the canopy relates to court entrances and adjacent structures. The smaller reference footprint is not automatically suitable for every constrained site.
Is a fixed opening time or motor life guaranteed?
Opening time and duty cycle follow the selected drive and roof arrangement. Share the expected daily operating frequency so the technical proposal includes the relevant equipment data.
Who should receive the operating information?
The venue owner should identify trained operators and the maintenance contact. Handover should make the controls, inspections, limitations and fault-reporting route clear to the people who will manage the roof day to day.
Continue your selection
Compare the canopy approach
DIRECT FROM OUR FACTORY
Get a quote for your retractable padel court canopy.
Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.
- Model and finish schedule
- Drawings and site interfaces
- Itemized equipment and packing scope

