PadelSpan
Padel Courts & Sports Equipment

Integrated Retractable Padel Canopy

A motorized opening-roof arrangement with a compact footprint. Coordinate the moving roof, electrical provision, controls and maintenance access from the design stage.

Configuration focus: Compact motorized roof configuration

Integrated Retractable Canopy · structure and dimension visualization
Product visualization
Integrated Retractable Canopy · product and colour visualizations
Product visualization

Structure & geometry

Overall dimensions L × W × H20.6 × 10.6 × 8.8 m
Column section100 × 100 × 3 mm
Column height6 m
Arch rise2.8 m
OperationMotorized opening / closing with controls selected for the venue

Membrane & site interfaces

CoveringPVDF membrane with material-specific technical documentation
Playing clearancePlaying clearance measured below the lowest roof member, light or service
Site designProject-specific support foundations, loading and drainage

Include in the equipment brief

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

Model images and full project information