Review seven component groups before comparing quotations. Use the photographs to identify the part, then confirm its actual specification and quantity in the equipment schedule.
COMPONENT 01
Steel structure
Columns, beams, base plates and connections define the enclosure. Match the section and connection arrangement to the selected court family.
Ask in your briefWhich frame variant, finish, colour and connection drawings are included?
The court families reference 12 mm tempered glass. Panel size, hole pattern, edge detail and support arrangement still need to match the ordered equipment.
Ask in your briefCan the panel schedule, supports and applicable material report be reviewed together?
Select the surface and colour together with the installation method. Joining materials and the specified infill should be clearly included or excluded.
Ask in your briefWhich turf specification, quantity, joining materials and infill form the supplied package?
Lighting should be coordinated with the court, canopy and venue use. The illustrated fixture is marked IP65; final fixture selection follows the project brief.
Ask in your briefWhich fixtures, poles, mounting details and electrical interfaces are specified?
The centre net, posts and tensioning arrangement should match the selected court. Keep the component references available for maintenance and replacement.
Ask in your briefWhich net, post, tensioning and protective parts are supplied?
Protect padel court entrances and net posts with fitted padding. Choose the coverage, colours and your club logo as an optional addition to the padel court package.
Select the turf, glass, mesh, lighting and fittings for your padel court. Our team incorporates your choices into the model drawings and itemized quotation.
210 m² supplied for the 200 m² internal playing area
Lighting and fixing options
Court lighting reference
8 × 200 W LED; final fixture and pole schedule to be agreed
Fixture protection
IP65 and IP66 fixture options, selected for the venue
Pole shapes
Curved and angular forms; confirm mounting details
Fastener reference
SUS304 bolts, nuts and washers in the component schedule
Glass connection option
6 mm transparent PC connecting plate; match to glass and support drawings
Replacing a part on an existing court?
Send the court reference, part position, dimensions and clear photographs. For glass, include the hole pattern. For fittings or electrical parts, include any identifying marks. An image alone is not enough to confirm compatibility.