Padel courts
Club & Economy Padel Courts
Club & economy padel courts, manufactured for everyday play.
- Internal playing area
- 20 × 10 m
- Tempered glass
- 12 mm tempered glass
- Corner-column options
- Paired 80 × 60 × 3 mm; 80 × 80 × 3 mm; 80 × 80 × 2.5 mm; or Classic paired 100 × 50 × 3 mm, according to configuration
Select a view. Open the main image for a closer look.
IS THIS THE RIGHT FIT?
Start with the way your venue will be used.
Everyday club play
A framed padel enclosure for club courts, training areas and community sports projects.
Compare the actual profiles
Economy A, B, C and Classic have different corner sections. Compare the member schedule with your project brief.
Your venue identity
Choose the frame finish, turf, lighting and optional safety padding as one equipment package.
The project fit
Look beyond the playing lines.
PadelSpan manufactures Club & Economy padel courts for sports clubs, schools, community facilities and commercial venues. Choose Economy A, Economy B, Economy C or Classic construction around a 20 × 10 m internal playing area, with steel framing, tempered glass, mesh, turf, centre net and LED lighting.
Our Hebei factory fabricates posts, beams and mesh frames to the selected model. Corner-post profiles distinguish the four models, while colour, turf, light poles, protective padding and branding give each venue its own identity. We prepare an itemized specification so you can compare the enclosure and supplied equipment clearly.
We coordinate the external footprint, entrances, base plates and fixing positions with your site team before production. The order drawings, component schedule and packing list stay aligned through manufacture, export and installation support.
MODEL BY MODEL
Explore the models in this family.
Compare the visible arrangement and its specific equipment schedule.
Product visualizationClub & Economy Padel Courts
Economy A Padel Court
Paired 80 × 60 × 3 mm corner profiles
Explore this model
Padel court installation
Product visualizationClub & Economy Padel Courts
Economy B Padel Court
80 × 80 × 3 mm square corner posts
Explore this model
Padel court installation
Product visualization
Padel court installation
Product visualizationClub & Economy Padel Courts
Classic Club Padel Court
Paired 100 × 50 × 3 mm corner profiles
Explore this model
Padel court installationCONFIGURATION BY CONFIGURATION
Choose the structure. Define the details.
Each option has its own structure and interfaces. Final dimensions and equipment follow the selected order drawings.
SELECTED CONFIGURATION
Economy A Padel Court
A paired-profile enclosure for projects comparing the frame layout and equipment scope of a club court.
| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 80 × 60 × 3 mm × 2; paired profiles |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

MATERIALS & CONNECTIONS
The details behind the configuration.
Framed mesh
Module dimensions, mesh opening, wire diameter and finish belong together in the enclosure schedule. Confirm entrance and door positions on the layout.
Glass connections
A transparent connecting plate links adjacent glass panels. The component reference specifies reinforced PC, 6 mm thick. Match the hole pattern, bolts and supporting structure to the selected glass-fixing schedule.
Profiles and fabrication
Section selection and connection drawings determine the ordered arrangement. This photograph shows fabricated profiles, not the dimensions of every court option.
Lighting selection
Select 200 W LED fixtures, light-pole shapes and mounting positions for the venue. IP65 and IP66 options are coordinated with the electrical supply and lighting layout.
FACTORY CONFIGURATION OPTIONS
The details that complete your padel court.
Choose the enclosure, playing surface and lighting to match your venue. We bring the selected components together in your manufacturing drawings and equipment schedule.
Mesh enclosure options
- Panel modules
- 1 × 2 m or 1 × 4 m
- Wire diameter reference
- 4 mm
- Mesh opening reference
- 50 × 50 mm
- Mesh-frame reference
- 50 × 30 × 2 mm
Surface options
- Material reference
- PE artificial turf
- Turf pile-height options
- CC: 12 mm; Upgrade: 12 mm; Match: 10 mm
- Density options
- CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
- Gauge reference
- 3/16; unit to be confirmed
- Turf supply allowance
- 210 m² supplied for the 200 m² internal playing area
Lighting and fixing options
- Court lighting reference
- 8 × 200 W LED; final fixture and pole schedule to be agreed
- Fixture protection
- IP65 and IP66 fixture options, selected for the venue
- Pole shapes
- Curved and angular forms; confirm mounting details
- Fastener reference
- SUS304 bolts, nuts and washers in the component schedule
- Glass connection option
- 6 mm transparent PC connecting plate; match to glass and support drawings
YOUR FINISHING SCHEDULE
Give the padel court your club identity.
Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.
The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.
Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

CHOOSE YOUR PLAYING SURFACE
Three turf options for your padel court
Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.
Compare turf specifications and samplesFROM CONFIGURATION TO SETTING
See a related arrangement.
Explore our padel court installations, from outdoor clubs to covered venues.

Outdoor courts Project photograph
Mexico: blue padel court in a landscaped venue.
Outdoor blue padel court in Mexico with dark steelwork, glass walls and a landscaped perimeter. The installation shows how the enclosure and surrounding access work together.
View projectDefine your equipment
Equipment scope & project choices
Keep the supply scope explicit.
Choose the structural configuration above, then record the selected components, site interfaces and exclusions in one equipment schedule. Review the final drawings with your local project team before construction.
Printable configuration overviewEquipment included
- Steel court enclosure and framed mesh panels
- Tempered-glass enclosure panels
- Artificial turf and court markings
- Centre net and posts
- Lighting and fixing schedule defined in the quotation
Make it fit your project
- Structure and turf colours
- Corner-column configuration
- Light-pole shape and lighting specification
- Protective padding and approved branding positions
- Separate canopy planning
A closer look
Configuration & component details
Open an image to inspect it. Product visualizations are identified in the captions.
From specification to site
Prepare for a coordinated delivery.
Installation interfaces
Coordinate the selected base plates, anchors and court footprint with the local foundation design. The installing contractor should confirm levels, drainage, access and electrical provision before delivery. Installation documentation must match the ordered configuration; a generic playing-area diagram is not a foundation drawing.
Installation supportCompare the three installation structuresPacking & arrival
Agree the packing list, component identification and unloading method before shipment. Glass, steel members, turf and small fittings require different handling. Container capacity and shipment weight depend on the confirmed order and packaging arrangement.
Shipping & packagingSupport & warranty terms
PadelSpan provides a five-year product quality warranty, with factory support for issue assessment and replacement-part identification. Send your order reference, component details and photographs through our after-sales service. Keep the drawings and maintenance record with the supplied equipment.
Component warranty: Frame/mesh: 5 years for paint fading or severe deformation. LED: 3 years; turf: 5 years under normal use.
Five-year warranty & factory supportAfter-sales supportExplore factory-direct padel court supply
Calculate your padel court project budget →
MADE, CHECKED & PACKED IN OUR FACTORY
Know what happens before the equipment reaches your site.
| Stage | What we coordinate | Your project record |
|---|---|---|
| Before manufacture | Model, quantities, finish and component interfaces | Approved drawing and equipment schedule |
| During fabrication | Member dimensions, connections and surface finish | Inspection and material identification |
| Before dispatch | Protected parts, glass packing and fitting kits | Packing list and component labels |
| At installation | Assembly sequence, tools and site interfaces | Installation information and technical support |
| During operation | Maintenance questions and replacement components | Part identification and five-year quality warranty |
YOUR TECHNICAL DOCUMENT PACK
From product selection to a clear equipment schedule.
Download the model specification, review the relevant material records and bring the site information into the drawing discussion.
Download language: English
Economy A Padel Court
Paired 80 × 60 × 3 mm corner profiles
Economy B Padel Court
80 × 80 × 3 mm square corner posts
Economy C Padel Court
80 × 80 × 2.5 mm corner posts
Classic Club Padel Court
Paired 100 × 50 × 3 mm corner profiles
Padel equipment delivery checklist
Drawing register, material schedule, packing identification and installation handover checklist.
Practical answers
Questions before you order
How do I choose between the corner-column options?
Share the location, site exposure and intended use. We compare the available corner-post profiles and coordinate the selected frame with the project loading requirements, anchors and foundation design.
Does Standard mean the court has a smaller playing area?
No. The reference doubles playing area is 20 × 10 m internally. The family name describes the enclosure offering. Its external structure, access and foundation requirements must be checked separately.
Can I compare the Standard and Panoramic options in one quotation?
Yes. Use the same court count, location, turf, lighting and delivery assumptions for both. That makes differences in structure and configuration easier to identify without confusing them with changes elsewhere in the scope.
Is the court suitable for an existing concrete slab?
Send the slab dimensions, construction information and clear site photographs. Our equipment drawings support your local engineer’s assessment of levels, slab condition, anchorage and the complete padel court footprint.
What should the first enquiry include?
Country, city, court count, indoor or outdoor use, approximate available space and your target schedule are enough to start. Include photographs or a sketch if available, and state whether a canopy is being considered.
Are turf infill and site electrical materials included?
Check the itemized scope. Infill, adhesive, cables, distribution equipment and civil works should each be listed as included or excluded. Their requirements depend on the selected surface, electrical design and installation plan.
Continue your selection
Compare another court arrangement

Panoramic Padel Court
Panoramic padel courts with open views and a defined steel frame.
Explore the product
WPT Tournament Padel Court
WPT-style tournament padel courts for indoor, outdoor and covered venues. Choose classic exposed corner posts or a panoramic hidden-corner design, with a complete factory-made equipment package.
Explore the product
Portable Padel Court
Portable padel courts with a dedicated movable base.
Explore the productDIRECT FROM OUR FACTORY
Get a quote for your club & economy padel courts.
Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.
- Model and finish schedule
- Drawings and site interfaces
- Itemized equipment and packing scope
CC turf
Upgrade turf
Match turf