Select a view. Open the main image for a closer look.
Club & Economy Padel Courts / FACTORY DIRECT
Economy A Padel Court
A paired-profile enclosure for projects comparing the frame layout and equipment scope of a club court.
- Configuration focus
- Paired 80 × 60 × 3 mm corner profiles
- Internal playing area
- 20 × 10 m / 200 m²
IS THIS THE RIGHT FIT?
Start with the way your venue will be used.
Everyday club play
A framed padel enclosure for club courts, training areas and community sports projects.
Compare the actual profiles
Economy A, B, C and Classic have different corner sections. Compare the member schedule with your project brief.
Your venue identity
Choose the frame finish, turf, lighting and optional safety padding as one equipment package.
DESIGN & CONFIGURATION
Understand the frame behind the view.
A paired-profile enclosure for projects comparing the frame layout and equipment scope of a club court.
Bring the enclosure layout, entrance positions and lighting into the same drawing review. Glass supports, mesh panels and the frame should match the selected model so that fabrication, packing and installation use consistent component references.
Frame section dimensions identify this configuration; the site exposure, anchorage and local foundation design determine the wider project requirements. Share the destination and layout when requesting the equipment proposal.
PRODUCT VISUALIZATIONS
Explore the design from every angle.
Compare the frame layout and colour combinations available for this model.
THE COURT IN ITS SETTING
See this padel court on site.
See how this padel court design works in outdoor and covered venues, with custom finishes and lighting.
TECHNICAL SPECIFICATIONS
Specifications for this model.
Keep these values together as a configuration. Final dimensions, quantities and interfaces follow the approved equipment schedule.
Download model PDF| Internal playing area | 20 × 10 m / 200 m² |
|---|---|
| Corner posts | 80 × 60 × 3 mm × 2; paired profiles |
| Glass | 12 mm tempered glass |
|---|---|
| Turf supply area | 210 m² supply area for the 200 m² playing rectangle |
| Turf pile-height options | CC: 12 mm; Upgrade: 12 mm; Match: 10 mm |
| Turf density options | CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m² |
| Turf colours | Blue / Green / Brick-red |
| Lighting | 8 × 200 W LED, IP66 |
| Padel frame finish | Seven standard frame colours; other references by quotation |
Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.
COMPONENTS & MANUFACTURING
Connect the specification to the details.
YOUR FINISHING SCHEDULE
Give the padel court your club identity.
Choose frame and turf colours, lighting style and brand positions together. Optional entrance and net-post padding adds your colours and logo at playing level.
The seven listed frame colours have no additional colour charge. Other frame colours carry an indicative surcharge of approximately USD 300 per set, subject to the final quotation.
Six references use RAL codes; the lime reference is PMS 376C. Screen colours are illustrative. Keep the stated code system and approve a physical finish sample.

CHOOSE YOUR PLAYING SURFACE
Three turf options for your padel court
Select CC, Upgrade or Match turf, then choose blue, green or brick-red. Confirm the chosen surface in the model's equipment schedule.
Compare turf specifications and samples
Optional padel court accessories
Add the protection to your padel court brief.
Protect padel court entrances and net posts with fitted padding. Choose the coverage, colours and your club logo as an optional addition to the padel court package.
FROM DRAWING TO ARRIVAL
Define the package before production.
Connect component identification to the approved drawings and packing list. Agree protection for finished members, fragile glass and smaller fitting kits, with unloading and storage planned at the receiving site.
Include in the model brief
- Court layout, member schedule and connection drawings
- Glass sizes, holes, fixing kit and packing sequence
- Turf product, colour, roll layout, joins and infill scope
- Lighting model, positions, electrical supply and pole arrangement
FROM CONFIGURATION TO SETTING
See a related arrangement.
Explore our padel court installations, from outdoor clubs to covered venues.

Outdoor courts Project photograph
Mexico: blue padel court in a landscaped venue.
Outdoor blue padel court in Mexico with dark steelwork, glass walls and a landscaped perimeter. The installation shows how the enclosure and surrounding access work together.
View projectMADE, CHECKED & PACKED IN OUR FACTORY
Know what happens before the equipment reaches your site.
| Stage | What we coordinate | Your project record |
|---|---|---|
| Before manufacture | Model, quantities, finish and component interfaces | Approved drawing and equipment schedule |
| During fabrication | Member dimensions, connections and surface finish | Inspection and material identification |
| Before dispatch | Protected parts, glass packing and fitting kits | Packing list and component labels |
| At installation | Assembly sequence, tools and site interfaces | Installation information and technical support |
| During operation | Maintenance questions and replacement components | Part identification and five-year quality warranty |
YOUR TECHNICAL DOCUMENT PACK
From product selection to a clear equipment schedule.
Download the model specification, review the relevant material records and bring the site information into the drawing discussion.
Download language: English
Economy A Padel Court
Paired 80 × 60 × 3 mm corner profiles
Padel equipment delivery checklist
Drawing register, material schedule, packing identification and installation handover checklist.
BEFORE YOU ORDER
Questions about this configuration.
What is different about the Economy A corner?
Economy A uses paired 80 × 60 × 3 mm corner profiles. The paired layout is part of this model’s enclosure drawing; it should be compared with the square-column arrangements of Economy B and C.
What is included with this padel court?
The equipment schedule identifies the steel frame, glass, mesh, artificial turf, centre net, lights and fittings for the chosen model. Foundations, drainage, electrical works, freight and installation responsibilities are listed separately in the proposal.
Can I add a roof or branded safety padding?
Yes. Choose a fixed or retractable canopy for a covered venue, and optional entrance or net-post padding with your colours and logo. The roof has its own support and foundation design, coordinated with the padel enclosure.
Which documents and support come with the proposal?
We prepare the selected model specification, layout and equipment schedule, followed by packing and assembly information for the order. Our factory provides installation guidance, spare-part identification and a five-year product quality warranty under the published terms.
MODEL BY MODEL
Compare within this family.
Compare the visible arrangement and its specific equipment schedule.
Product visualizationClub & Economy Padel Courts
Economy B Padel Court
80 × 80 × 3 mm square corner posts
Explore this model
Padel court installation
Product visualization
Padel court installation
Product visualizationClub & Economy Padel Courts
Classic Club Padel Court
Paired 100 × 50 × 3 mm corner profiles
Explore this model
Padel court installationDIRECT FROM OUR FACTORY
Get a quote for your economy a padel court.
Tell us where you are building and how many padel courts you need. We will prepare the model configuration, supply scope and delivery proposal with your project team.
- Model and finish schedule
- Drawings and site interfaces
- Itemized equipment and packing scope



CC turf
Upgrade turf
Match turf