SIDE BY SIDE

Compare padel courts.

Read all four court families against the same project questions. The values below follow the individual product specifications; the final order defines the selected configuration.

SPECIFICATIONS YOU CAN COMPARE

Choose a complete equipment configuration.

Compare the frame, glazing, surface and lights as one package. Select the court model and corner arrangement alongside the equipment schedule.

Scroll the table sideways on smaller screens.

Two equipment packages, compared on the same basis
ComponentSteel-beam package · 8 × 200 WAluminium upper-beam package · 4 × 400 W
Steelwork & finishQ235 steel; hot-dip galvanized; black polyester powder coatingQ235 steel frame with an aluminium upper beam; black powder-coated finish
Tempered glass18 × 3,000 × 1,996 × 12 mm18 × 3,000 × 1,996 × 12 mm
Supplied turfPE · 12 mm · 9000D · 58,500 / m² · 210 m²PE · 12 mm · 9000D · 52,500 / m² · 210 m²
Lighting equipment8 × 200 W LED · IP664 × 400 W LED · IP66
Bolts, nuts & screws304 stainless steel304 stainless steel

The 4 × 400 W package is an additional option. The 8 × 200 W catalogue and 4 × 350 W export options remain available. Select one complete schedule for the quotation.

The two packages retain their declared turf densities. Other CC, Upgrade and Match choices are listed separately; yarn units and the selected turf construction are recorded in the order.

View component dimensions & warranty

COMPARE SPECIFIC MODELS

Choose up to three configurations.

Compare the actual member and equipment schedule within or across families.

Economy A · product and colour visualizations

Club & Economy Padel Courts

Economy A Padel Court

Paired 80 × 60 × 3 mm corner profiles

Internal playing area
20 × 10 m / 200 m²
Corner posts
80 × 60 × 3 mm × 2; paired profiles
Glass
12 mm tempered glass
Turf supply area
210 m² supply area for the 200 m² playing rectangle
Turf pile-height options
CC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density options
CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf colours
Blue / Green / Brick-red
Lighting
8 × 200 W LED, IP66
Padel frame finish
Seven standard frame colours; other references by quotation
Full specifications →
Economy B · product and colour visualizations

Club & Economy Padel Courts

Economy B Padel Court

80 × 80 × 3 mm square corner posts

Internal playing area
20 × 10 m / 200 m²
Corner posts
80 × 80 × 3 mm
Glass
12 mm tempered glass
Turf supply area
210 m² supply area for the 200 m² playing rectangle
Turf pile-height options
CC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density options
CC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf colours
Blue / Green / Brick-red
Lighting
8 × 200 W LED, IP66
Padel frame finish
Seven standard frame colours; other references by quotation
Full specifications →

Compare the four padel court families

On a smaller screen, scroll the table sideways to compare every court.

Padel court family specifications and project planning requirements
What to compareStandard padel court product visualization with turquoise turf, framed glass, mesh and four lighting polesClub & Economy Padel CourtsPanoramic QF · product and colour visualizationsPanoramic Padel CourtWPT Tournament panoramic padel court design renders with red and blue turfWPT Tournament Padel CourtPortable padel court product visualization with red turf and external triangular base supportsPortable Padel Court
Internal playing area20 × 10 m20 × 10 m20 × 10 m20 × 10 m
Tempered glass12 mm tempered glass12 mm tempered glass12 mm tempered glass12 mm tempered glass
Enclosure and support arrangementCorner-column options: Paired 80 × 60 × 3 mm; 80 × 80 × 3 mm; 80 × 80 × 2.5 mm; or Classic paired 100 × 50 × 3 mm, according to configurationFrame connection options: External or internal connection arrangements Upper-beam section options: 100 × 50 × 3 mm or 100 × 100 × 3 mm, matched to the chosen configurationCorner structure options: Classic exposed posts / Panoramic hidden-corner connectionsConfiguration arrangement: Padel court with a dedicated movable base platform Support interface: Project-specific surface and base assessment
Surface and finishSurface: Artificial turf with colour optionsFinish and surface: Structure and artificial-turf colour choicesSurface: Artificial turf with colour optionsSurface: Artificial turf coordinated with the selected platform
LightingLED arrangement confirmed with the equipment scheduleConfirm the lighting arrangement and equipment schedule for the selected configuration.Position and fixture specification coordinated for the projectConfirm the lighting arrangement and equipment schedule for the selected configuration.
Project fitContractors comparing clearly defined enclosure configurations. Clubs planning their first courts or a phased expansion. Distributors building a consistent equipment specification.Clubs balancing visibility and a defined framed enclosure. Hotels coordinating courts with guest-facing outdoor spaces. Installers comparing connection arrangements before procurement.Tournament-style club centre courts. Indoor, outdoor and covered padel venues. Spectator and filming layouts with clear glass sightlines.Temporary sports venues with a defined installation period. Events with planned transport and handling operations. Operators assessing a future relocation before committing to a site.
Installation planningCoordinate the selected base plates, anchors and court footprint with the local foundation design. The installing contractor should confirm levels, drainage, access and electrical provision before delivery. Installation documentation must match the ordered configuration; a generic playing-area diagram is not a foundation drawing.Approve the selected connection arrangement and glass interfaces before foundations and anchorage are finalized. Check the finished playing level, entrance clearances and access for safe glass handling. Use the installation package matching the ordered variant.Glass supports and connections must follow the approved configuration. Coordinate the local support and anchorage design, safe handling method and erection sequence before delivery. Spectator routes and any event-specific access requirements should be resolved alongside the court layout.Confirm surface condition, level, support requirements, access and the platform's complete external footprint with the venue team. Agree any anchorage or ballast provisions through the project design. Plan assembly, inspection and removal as separate activities with suitable personnel and handling equipment.
Configuration choicesStructure and turf colours; Corner-column configuration; Light-pole shape and lighting specification; Protective padding and approved branding positions; Separate canopy planning.Internal or external frame connections; Structure colour and turf colour; Light-pole configuration; Entrance padding and branding; Canopy coordination.Classic exposed 100 × 100 mm corner posts or panoramic hidden-corner design; Structure and turf colours; Lighting layout and pole form; Protective padding and branding; Spectator-area and canopy interface coordination.Structure and turf colours; Lighting arrangement; Protective padding and venue branding; Packaging and component identification for relocation; Spare-parts planning.
Next stepRequest configurationRequest configurationRequest configurationRequest configuration

Compare quotations on the same basis.

Use the same court count, location, turf, lighting and delivery assumptions for every option. Ask for separate lines covering equipment, freight, site works and installation so a difference in scope does not look like a difference in court price.

Build a clear quotation scope
Compare your budget and operating scenarios

Check the site before the model.

Our team coordinates the frame design with your local wind loads, foundation layout and site exposure. Allow space around the 20 × 10 m playing area for structure, access and maintenance. For portable padel courts, we also plan the base, surface and handling route.

Prepare a project brief

YOUR NEXT STEP

Compare the options for your own venue.

Share your location, court count and what you have in mind. Vicky will help shape the equipment brief.

Request a QuoteWhatsApp