LOCAL PREVIEW · UPDATED 1 NOVEMBER 2026
Website Terms
Use this website to explore courts and prepare a project discussion. The following notes explain the scope of the preview, its information and its enquiry tools.
Product and project information
Product descriptions, comparison tables and printable overviews present our available padel courts and sports equipment. Product visualizations show design options; photographs show equipment, manufacturing and installations. Your quotation and approved drawings record the selected dimensions, materials, components and finishes.
Quotations and commercial agreement
This website does not take payment or accept equipment orders. A quote request or planner summary is a starting point for discussion. Price, delivery terms, schedule, supply scope, warranty, exclusions and responsibilities need to be agreed in the applicable written quotation and order documents. No fixed project price, return on investment or opening date is established by the planner.
Site design and local responsibilities
Planning guides help identify questions and interfaces. They do not replace the site-specific work of the relevant designers, engineers, installers or approving authorities. Check foundations, anchorage, structural loads, drainage, electrical work, access, clearances and any local approvals for the actual project. Use the approved drawing revision and equipment schedule for procurement and installation.
Supporting documents
Original reports and attestations retain their named holders, issuers and scopes. A document concerning a material or a named product does not establish approval of every court, supply batch or installation. Review the complete original and confirm its relevance to the selected equipment. Configuration overview files are reference documents, not construction drawings.
Using the local enquiry tools
The preview form validates and saves accepted enquiries and attachments locally. It does not send an email, create a CRM entry or send a WhatsApp message. A saved enquiry is not an accepted order. Phone and WhatsApp links are separate contact options; you decide whether to place a call or send a message in the external application.
Provide accurate contact and project details, and submit only files you are entitled to share. The form accepts PDF, JPG, PNG, DWG and DXF files within the displayed limits. Do not use the form to upload harmful files or unrelated sensitive information. See the Privacy Policy for the preview’s data handling.
External services and questions
Maps, WhatsApp and referenced technical resources are external services. Their content, availability and terms are managed by their respective providers. For a question about a court configuration or the information on this website, contact Vicky Zhang on +86 131 8907 8662 or visit the contact page.