PadelSpan · Hebei, China

Padel court manufacturing, from Hebei to your project.

PadelSpan designs and manufactures padel courts and sports equipment in Hebei, China. Our factory coordinates steel fabrication, protective finishing, court components and export packing. We supply club, panoramic, WPT tournament and portable padel courts, fixed and retractable roofs, and custom finishes for international projects.

Aerial view of the Hebei padel court factory and its production buildings
Manufacturing base exterior · source photograph enhanced for clarity
Production lines
8
Production equipment units
85
Warehouse area
3,000 m²
Production workshop area
12,000 m²

1,500 padel court sets per yearProduction capacity. Your order schedule is confirmed against the model, configuration and current production plan.

ROOTED IN MANUFACTURING

Built around steel. Organised around your project.

Our factory is based in Hebei, one of China’s major steel-producing regions. PadelSpan designs and produces padel courts, padel court canopies, squash courts, football cages and pickleball nets for international sports facilities.

Technical staff, production equipment and dedicated processing areas support the progression from the agreed equipment specification to packed components. Our people-centred approach means practical coordination between the customer, technical team and production floor.

Every project begins with a defined scope: the padel court model, site conditions, component choices, finishes and delivery responsibilities. This gives the team a clear basis for production and gives you a clear basis for evaluating the quotation.

Review padel court materials & specifications

PRODUCTION CAPABILITY

From steel sections to a coordinated shipment.

View the detailed process
  1. 01

    Material preparation & cutting

    Steel sections are prepared for the agreed padel court model. Cutting and component preparation turn the drawing schedule into parts ready for fabrication.

  2. 02

    Fabrication & welding

    Posts, beams, mesh frames and connecting elements are fabricated for the selected structure. The configuration determines the component sizes and connection details.

  3. 03

    Corrosion protection & finishing

    Galvanizing, rust removal and coating form part of the production capability. The treatment sequence, finish and colour are specified for the chosen configuration and site exposure.

  4. 04

    Inspection & component coordination

    Steelwork is coordinated with the selected glass, turf, lighting and net components. Inspection requirements and supporting documents are agreed as part of the order.

  5. 05

    Packing & dispatch

    Components are organised for protective packing and transport. Packing lists, unloading requirements and the installation sequence connect factory dispatch with the destination site.

MANUFACTURING & SUPPLY RESPONSIBILITIES

Know what travels with your court.

Frame fabrication & finish

The manufacturing drawings define steel grade, sections, connections and finish. Production and inspection records follow that selected configuration.

Glass, turf & equipment supply

Glass, turf, lights and fittings are coordinated in one equipment schedule. Supporting documents retain the actual manufacturer or holder and their component scope.

Site design, shipping & installation

Agree foundations, anchorage, local loads, electrical work, freight terms and installation responsibilities for the destination. Keep these lines visible in the quotation.

Compare complete equipment packages

What factory-direct padel court supply means for your project.

Speak with the factory that builds your padel court. PadelSpan brings model selection, technical details, production and export preparation into the same conversation.

Compare the equipment and the services in each quotation. The details below show what our factory provides and where to review the supporting information.

Six things to compare before ordering a padel court
Your purchasing priorityWhat PadelSpan providesExplore the details
Quotation & supply scopeReceive a factory quotation for the selected padel court model, quantity and finish. Equipment, accessories, documents and delivery responsibilities are listed so you can compare the same scope.What belongs in a padel court quote
Materials & constructionReview the steel sections, wall thickness, 12 mm tempered glass and specified connection fittings for your model. The member schedule identifies the construction you are buying.Materials & component specifications
CustomizationCoordinate frame colours, turf, light-pole shapes, logo positions and optional padel court safety padding directly with manufacturing. The finish schedule records the selected options.Colours, branding & custom details
Inspection & documentsReview original material and product reports alongside the equipment specification. The document holder, tested item and report scope identify which records apply to your order.Certificates & test reports
Packing & deliveryLink protected steel members, separately packed glass and fitting kits to the packing list. Component identification helps the receiving team organise unloading, storage and assembly.Packing and project handover
Installation & after-salesKeep a direct factory contact for assembly questions, component identification and replacement parts. PadelSpan provides a five-year product quality warranty and guidance for your local installation team.Five-year warranty & factory support

Scroll the table sideways to see the supporting resources.

From the member schedule to the fitting kit.

Fabricated steel members and beam connections link the drawings with the components your installation team receives.

Follow the manufacturing process
Yellow coated steel court components bundled in a workshop
Coated steel court components prepared for packing · factory photograph
Exterior and interior beam-to-column connections shown side by side
External and internal beam-to-column connections · component photograph

Put your factory-direct padel court brief in motion.

Send the destination, court count, preferred model and finish. Our team will prepare the equipment proposal around your site and delivery requirements.

Get a factory-direct quote

PEOPLE & RESPONSIBILITIES

A connected team, with a clear point of contact.

Project & export coordination

A clear equipment brief, quotation scope, document requirements and shipment plan keep the factory and project team working from the same information.

Technical & production coordination

Technical staff translate model selection, dimensions, finishes and accessory choices into the agreed production configuration.

Quality & delivery support

Inspection, packaging and installation support connect the manufactured components with the people receiving and assembling them.

Meet Vicky Zhang, Senior Project Manager. Connect your commercial brief with the manufacturing and export teams.

Meet your project contact

BEFORE PRODUCTION

A useful brief makes a better quotation.

Bring the factory into the discussion while the project scope is still taking shape.

01 / Site & use

Destination, indoor or outdoor location, available site dimensions and expected padel court count.

02 / Equipment configuration

Preferred model, canopy, turf, lighting, structural finish, branding and optional safety accessories.

03 / Documents & delivery

Required drawings and reports, installation responsibilities, delivery point and target schedule.

Explore product certificates & reports

MANUFACTURING QUESTIONS

Clarify the factory scope early.

Can I buy padel courts directly from the PadelSpan factory?

Yes. PadelSpan manufactures padel courts in Hebei, China. Our project team connects your model selection and quotation with the technical, production and export teams. Send your destination, padel court count, site setting and preferred configuration to start.

What should I compare between a factory and a trading company?

Compare the same model, member sizes, finish, glass, lighting, accessories, documents and delivery terms. Ask who prepares the technical drawings, handles specification changes and supplies replacement parts. A distributor may also provide local stock, import handling or installation; identify those services separately when comparing the quotations.

Are all PadelSpan padel court steel profiles the same thickness?

No. Steel sections and wall thickness vary by model and component. For example, Economy C uses 80 × 80 × 2.5 mm corner posts, while Economy B lists 80 × 80 × 3 mm. The selected model and its component schedule provide the specification for your order.

Which sports facility products does PadelSpan manufacture?

Our range includes padel courts, fixed and retractable padel court canopies, squash courts, football cages and pickleball nets. The quotation defines the components and services included in your selected package.

Can the padel court configuration be customised?

We can discuss frame colours, turf, lighting, logo applications and optional accessories. Structural or dimensional changes require a project review before the configuration is confirmed.

How is the manufacturing schedule confirmed?

Share your selected model, quantity, finish and target delivery date. The production team reviews these details against current planning before a schedule is agreed. We schedule fabrication, finishing, inspection and packing around the agreed delivery plan.

What should we request before placing an order?

Start with a defined equipment list, the selected model drawings, materials and finish schedule, applicable inspection documents, packing scope and delivery responsibilities. Site foundations, permits and local engineering requirements should be coordinated with your local professionals.

YOUR NEXT STEP

Put your padel court project into production.

Share your location, court count and what you have in mind. Vicky will help shape the equipment brief.

Request a QuoteWhatsApp