PICKLEBALL EQUIPMENT
Pickleball Nets & Posts
Frame-supported pickleball nets for clubs, multi-sport venues and equipment distributors. Compare the floor-mounted and classic configurations, then specify the base, finish and quantity for your project.
- Overall frame length
- 7,110 mm
- Frame height
- 914 mm
- Floor-mounted & classic
- 2 options

CHOOSE YOUR CONFIGURATION
Pickleball nets, built for your venue.
Our pickleball net frames combine aluminium tubing, a continuous lower support rail and braced end posts. Choose a low-profile floor-mounted frame or a classic raised-foot arrangement, both with wheels for venue handling. The 7,110 mm frame carries a 6,700 mm polyethylene net, with 6,710 mm post spacing. We coordinate the base, finish, logo details and order quantity for clubs, schools and distributors.

Floor-mounted net frame
A low-profile full-length frame with braced end posts. Use the drawing review to confirm base contact points, wheel arrangement and how the frame will sit on the finished playing surface.

Classic net frame
An end-post and cross-foot arrangement with the net carried above a continuous lower rail. Confirm the exact base, wheel and net-height adjustment details for the selected assembly.
TECHNICAL SPECIFICATIONS
Know what you are specifying.
Review the equipment schedule alongside your venue layout. The agreed drawing and quotation define the final supply scope.
| Overall assembled envelope | 7,110 × 600 × 914 mmLength × width × height, as listed for both configurations. |
|---|---|
| Net post spacing | 6,710 mmpost-to-post spacing; separate from the net length. |
| Net length | 6,700 mmnet length and drawing dimension. Overall frame length: 7,110 mm. |
| Frame material | Aluminium alloy tubingtube thickness: 3 mm; confirm the profile schedule with the selected drawing. |
| Surface finish | Electrostatically applied coatingColour and coating specification agreed with the order. |
| Net material | PolyethyleneProduct specification for the supplied mesh. |
| Mesh opening | 45 mmNominal dimension. |
| Net cord | 3 mm woven cordConfirm replacement net compatibility by the approved assembly drawing. |
| Upper mesh reinforcement | First 6 rows double-layer wovenProduct description of the net construction. |
| Base arrangements | Floor-mounted / classicWheel, foot and tensioning details depend on the selected configuration. |
The assembled frame is 7,110 × 600 × 914 mm. Net length and post spacing are listed separately below. Set the installed centre and sideline net heights for the intended playing requirements using the assembly instructions.
APPLICATIONS
Plan for your venue.
Equipment choices work best when they reflect the people, space and daily operation of the facility.
Pickleball clubs
Specify repeatable net assemblies across multiple playing areas, with a clear replacement-parts reference.
Schools & community venues
Review moving, storage and supervision needs alongside the equipment footprint and playing surface.
Multi-sport developments
Coordinate pickleball equipment with padel courts and other sports equipment in a single procurement brief.
PRODUCT & APPLICATION VIEWS
See the equipment in detail.
Open any image to explore the materials, construction and installation details.
Explore the product design, installation settings and component details. We manufacture your selected configuration to the agreed drawings and finish schedule.
FROM BRIEF TO HANDOVER
A coordinated route to installation.
- 01
Select the assembly
Confirm the floor-mounted or classic format and the venue operating requirements.
- 02
Approve the details
Review the dimensioned frame drawing, net attachment, finish and packing scope.
- 03
Coordinate shipment
Agree the equipment quantity, packing arrangement and destination delivery terms.
- 04
Set up & maintain
Follow the supplied assembly guidance, set the net correctly and periodically check fixings, wheels and mesh.
BEFORE YOU ORDER
Your questions, answered.
Need a detail specific to your site? Include it in the project enquiry.
Speak with our teamAre the two net frames the same size?
Both frames measure 7,110 × 600 × 914 mm. The floor-mounted and classic versions use different base profiles; their assembly drawings show the feet, wheels and fixing details.
Why are both 6,710 mm and 6,700 mm shown?
They refer to different items. The text lists 6,710 mm net-post spacing and 6,700 mm net length; the overall frame is 7,110 mm long. PadelSpan keeps those values separate in the equipment brief.
Can the colour and branding be customized?
Colour and branding can be included in your request. Send the required finish reference, artwork and quantity so the available configuration and production scope can be confirmed.
Can the net be moved between playing areas?
Yes. Wheeled bases support movement between sessions. We select the base and contact points around your finished surface, access route and storage plan.
How is the net set up for play?
Assemble the frame on a level surface, tension the net and set the centre and sideline heights for your playing requirements. The 914 mm value is the frame height; the installation instructions guide the completed net setup.
Can pickleball equipment be quoted with a padel project?
Yes. Include the number of pickleball nets and padel courts in the same enquiry. Vicky can organize separate equipment specifications within one project brief.
LET’S DEFINE YOUR PROJECT
Turn your site requirements into an equipment brief.
Share the destination, quantity and site information. Vicky Zhang, Senior Project Manager, will help coordinate the next specification step.
- Net product configuration and quantity
- Installation country and indoor or outdoor use
- Finished surface, movement and storage requirements
- Preferred colour, logo artwork and target delivery window