PadelSpan
Padel Courts & Sports Equipment

Economy A Padel Court

A paired-profile enclosure for projects comparing the frame layout and equipment scope of a club court.

Configuration focus: Paired 80 × 60 × 3 mm corner profiles

Economy A · product and colour visualizations
Product visualization

Structure & geometry

Internal playing area20 × 10 m / 200 m²
Corner posts80 × 60 × 3 mm × 2; paired profiles

Surface, glass & equipment

Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Include in the equipment brief

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

Model images and full project information