PadelSpan
Padel Courts & Sports Equipment

Portable Platform Padel Court

A court enclosure supplied around a dedicated platform arrangement. Plan the receiving surface, access, levelling and handling together with the enclosure.

Configuration focus: Court + dedicated relocatable platform

Portable Platform Court · product and colour visualizations
Product visualization

Structure & geometry

Internal playing area20 × 10 m / 200 m²
Configuration compositionPadel court + dedicated relocatable base platform
Steel member scheduleDefined by the selected platform and enclosure drawings

Surface, glass & equipment

Glass12 mm tempered glass
Turf supply area210 m² supply area for the 200 m² playing rectangle
Turf pile-height optionsCC: 12 mm; Upgrade: 12 mm; Match: 10 mm
Turf density optionsCC: 52 500 / m²; Upgrade: 63 000 / m²; Match: 46 200 / m²
Turf coloursBlue / Green / Brick-red
Lighting8 × 200 W LED, IP66
Padel frame finishSeven standard frame colours; other references by quotation

Include in the equipment brief

Your selected configuration is supplied with coordinated drawings, quantities and an itemized equipment schedule.

Model images and full project information