
Five specifications to compare first
Ask each bidder to identify the exact turf model, infill specification and installation scope. A photograph and a description such as ‘premium textured turf’ leave too much room for different products to be priced as equivalents.
PadelSpan supplies courts and associated systems, coordinating product selection, drawings, export transport and installation support. Use this guide to prepare your specification, then compare the available CC, Upgrade and Match options on our padel court turf page.
| Specification | What to request | What it helps you compare |
|---|---|---|
| Pile height and yarn | Height in mm; yarn material, construction and texture | The proposed playing surface and its matching infill |
| Density and yarn quantity | Tufts/m², stitches per stated length, gauge, yarn unit and face weight | Whether quoted figures describe comparable constructions |
| Sand infill | Type, grading, dry kg/m² and installation instructions | Material quantities, installation work and ongoing care |
| Backing and installation | Primary backing, coating, drainage data, seams and base requirements | Compatibility with the actual site and installation method |
| UV, performance and warranty | Model-specific reports, test conditions and written coverage | Evidence for the proposed use and the scope of support |
Set priorities for the way the court will operate
A busy club should compare maintenance access, cleaning time and consistency between courts alongside the initial price. Record anticipated weekly use and who will brush, inspect and replenish the surface. A specification that the operator cannot maintain is a poor fit for the business.
For an outdoor hotel or resort, discuss sunlight, rainfall, surrounding trees, guest access and acceptable closure periods. A canopy changes exposure but does not automatically make the court equivalent to an indoor hall. Indoor projects still need to address sand handling, cleaning and any project-specific fire or emissions requirements.
Contractors need a defined boundary between surface supply, base acceptance and installation. Distributors need a repeatable model reference and an agreed process for substitutions. Resurfacing buyers should start with a condition survey, especially where puddles, loose seams or uneven areas already affect play.
1. Pile height and yarn construction
A 10–12 mm pile height is common in offered padel turf ranges, including PadelSpan’s current options. It is not a universal requirement or a ranking system. Compare the complete product specification: two carpets with the same nominal height can have different yarn constructions, infill requirements and maintenance instructions.
Monofilament describes a yarn construction; textured or curled describes its form. A textured monofilament is still a monofilament. Ask whether the product uses straight yarn, textured yarn, fibrillated tape or a combination, and request a labelled sample that matches the quotation.
MONDO’s Supercourt XN is one specific example of textured monofilaments supplied as a system with silica sand infill. That description helps explain the terminology; it does not establish equivalent performance or approval for another supplier’s turf.
2. Density, stitch rate, gauge, dtex and face weight
Padel turf density is usually expressed as tufts per square metre. Stitch rate describes stitches along a stated length, while gauge describes spacing between tufting rows. Compare the units and counting method before treating two density figures as equivalent. There is no universal 50,000 tufts/m² pass mark, and greater density alone does not establish better durability.
For a useful arithmetic check, assume a 3/16-inch gauge and one tuft per stitch. Row spacing is 4.7625 mm, giving about 210 rows per metre. At 25 stitches per 10 cm, there are 250 stitches per metre: approximately 210 × 250 = 52,500 tufts/m². Use this as a comparison check and ask the supplier to explain the construction, counting method and tolerances behind any different quoted density.
Dtex measures yarn mass in grams per 10,000 metres; denier uses 9,000 metres. They are different units. If a sheet has a ‘DTEX’ heading but a value ending in ‘D’, have the supplier confirm the intended unit and whether it describes a filament or the full yarn bundle. Removing the letter does not resolve that ambiguity.
Face weight, in g/m², describes the pile yarn mass per area; total carpet weight also includes backing and coating. Request both labels explicitly. Neither a larger dtex number nor a heavier total carpet proves a longer service life without the rest of the construction and relevant evidence.
3. Sand infill: specify the material and the work
Textured turf with little visible sand may still require sand infill. Confirm the selected product’s instructions rather than judging a photograph. MONDO’s textured example uses silica sand, while SAPCA’s UK construction guidance discusses sand-dressed and sand-filled padel surfaces. Neither supplies a universal sand quantity for every carpet.
Request the specified sand type, particle grading and dry application rate in kg/m², plus the total quantity for your installation. Establish who supplies it, whether it arrives with the turf or is sourced locally, and who checks a local substitute against the specification. Do not carry a football rubber-infill specification into a padel order.
The installation method should state how the sand is distributed and brushed in, what checks precede opening and how subsequent levels are maintained. Include suitable equipment and staff time in the budget. Sand that appears hidden still needs an appropriate care routine, and a rinse alone is not a complete maintenance programme.
4. Backing, drainage and installation
Separate the primary backing, into which the yarn is tufted, from the secondary coating that helps secure it. PP, SBR and PU describe materials used in these layers. Their names alone do not establish low emissions, environmental performance or a durability grade. Ask for evidence relevant to the selected finished product and project requirements.
A permeable carpet cannot correct a base that traps water. Review the route through or across the surface, the supporting construction and the final drainage outlet with the local designer. LTA guidance treats foundations and drainage as site-specific design work in its UK context; it should not be presented as a universal construction detail.
Before delivery, agree base acceptance criteria, roll layout, pile direction, line positions, seam tape and adhesive. Check adhesive compatibility and installation conditions with the installer, including curing time before play. Use our foundation and drainage guide to organise the site questions and installation support information to define the drawings and assistance required.
5. UV resistance, performance evidence and warranty
For exposed sites, ask for a UV or weathering report identifying the tested product, test method, light source, exposure conditions, duration and measured result. TenCate’s UV Stability advisory explains that accelerated weathering methods use different light sources. An hours figure without those conditions is a weak basis for comparing products or predicting years outdoors.
Read playing-performance evidence with equal care: which model, backing, infill and test conditions were used? The FIP Rules of Padel applicable from January 2026 require regular ball bounce and refer synthetic surfaces to the relevant homologation annex. A model name such as Match does not itself establish FIP, FEP or tournament approval. Request the document that actually covers the proposed model and intended use.
Keep warranty coverage separate from expected service life. Read the covered defects, exclusions, maintenance obligations, claim procedure and remedy, including whether removal, freight and reinstallation are included. Do not translate a warranty period into a promise of unchanged colour or performance throughout that period.
New court or turf replacement: define different scopes
For a new court, coordinate the surface with the enclosure, net arrangement, entrances and construction sequence. The installer needs an accepted base and clear access before rolls, adhesive and infill arrive. Keep the turf selection in the same equipment schedule as the other court specifications, even when the surface is bought separately.
For padel court turf replacement, add removal of the old carpet and infill, lawful disposal, base cleaning, any repairs and a fresh level and drainage assessment. Measure the existing layout rather than ordering only from the nominal court size. Photographs help scope the enquiry but cannot confirm what will be found beneath the old surface.
Agree inspection and repair decisions before fixing a reopening date. If adjoining courts remain open, plan access, storage and separation of the work area with the venue team. Keep the original product and maintenance records available for after-sales or replacement discussions.
Compare the installed and maintained cost
Put competing quotations on the same basis: carpet quantity and cutting allowance, line material, sand, joining materials, packaging, freight, duties or taxes, unloading and local transport. Show installation and base repairs separately. A lower carpet price may simply exclude work or materials included elsewhere.
For operating costs, list brushing and cleaning labour, equipment, infill top-ups, inspections and planned repairs over the same comparison period. Add the closure time your venue expects for installation or replacement, using your own booking assumptions. Do not infer a payback period from the turf specification alone.
Use the court quotation scope guide to record exclusions and responsible parties. For a complete new build, compare court configurations separately so a change in enclosure design is not confused with the cost of the playing surface.
Confirm the surface package before ordering
Keep the agreed schedule with the quotation, selected sample and installation instructions. Record any substitutions before order approval, then use those documents to check the delivery with your installer.
| Order item | Confirmation to record |
|---|---|
| Turf identity and quantity | Exact model, colour, sample reference, roll layout, area and cutting allowance |
| Construction | Pile height, yarn type, confirmed units, density basis, face weight and backing |
| Infill and joining materials | Sand type, grading, kg/m², total quantity, seam tape, adhesive and supply responsibility |
| Base and installation | Acceptance criteria, drainage, installer, laying conditions, curing and handover checks |
| Evidence and care | Applicable product reports, maintenance instructions and written warranty terms |
| Delivery and replacement scope | Destination, trade terms, unloading, local works, removal and disposal where needed |
Practical answers
Padel turf buying questions
Should I choose 10 mm or 12 mm padel turf?
Compare the complete model and infill specification against your venue’s use and maintenance capacity. Height alone does not determine playing quality or durability. Ask for a matching sample, installation instructions and relevant performance evidence for each option.
Does textured or curled padel turf need sand?
It can, and many textured padel systems use sand infill. Less visible sand does not mean sand-free. Follow the selected model’s specified sand type, grading, application rate and maintenance instructions.
Is a higher turf density always better?
No. First compare tufts/m² using the same counting basis, then consider yarn construction, face weight, backing, infill and performance evidence. A larger density number alone is not a durability guarantee.
Are dtex and denier the same?
No. Dtex is grams per 10,000 metres of yarn; denier is grams per 9,000 metres. Confirm the supplier’s unit and yarn reference before converting or comparing figures, particularly when a DTEX heading accompanies values marked D.
Can outdoor padel turf be used indoors?
Some products are specified for both settings, but outdoor suitability alone does not confirm indoor suitability. Check the exact product, infill, adhesive and base, together with the building’s relevant fire, emissions, cleaning and operating requirements.
When should padel court turf be replaced?
Use condition inspections and the product’s guidance, not a fixed age alone. Investigate persistent wear, loose seams, inconsistent play or drainage problems. Establish whether maintenance or repair can resolve the issue, and plan replacement around the venue’s actual condition and use.
What information should I provide for a turf quotation?
Send the location, court count, indoor/outdoor/covered setting, new-build or replacement scope, expected use, preferred colour and base condition. Include measurements or photographs where available and state whether you need turf only or a wider package with infill, joining materials and support.
Further reference
Sources & scope
- SAPCA Code of Practice for the Construction of Padel Courts, 5th edition, September 2025 — UK guidance
- MONDO Supercourt XN — third-party product example, not PadelSpan product evidence
- Coats Thread Numbering — yarn unit definitions
- TenCate Grass Components UV Stability advisory (2023) — weathering methods
- LTA Padel Court Construction Guidance (2025) — UK project context
- FIP Rules of Padel, applicable from 1 January 2026 — court rules and annex references
Our technical team translates your site layout, equipment choices and local construction requirements into a coordinated manufacturing and delivery brief.